MaintainX, an Autodesk company
EnterprisePricing
Hyster-Yale

Hyster-Yale Lift Truck GLP110VXNGGE088

Need answers fast?
Explore the manual using AI.

Hyster-Yale Lift Truck GLP110VXNGGE088
Hyster-Yale Lift Truck GLP110VXNGGE088

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Hyster-Yale Lift Truck GLP110VXNGGE088

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Hyster-Yale Lift Truck GLP110VXNGGE088

Hyster-Yale Lift Truck GLP110VXNGGE088

Create an account to install this asset package.

Maintenance Plans for Hyster-Yale Lift Truck Model GLP110VXNGGE088

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly / 6 Monthly Lift Chains Wear Check

Check mark

Chain Wear Measurement

Check mark

Measure the chain length where it moves over sheaves

Check mark

Is the chain section 3% longer than a new chain section?

Check mark

Chain Scale Check

Check mark

Use a chain scale (Yale P/N 518098689) to check lift chains as shown in Figure 62

Run this procedureArrow right

8 Hourly / 1 Daily Engine Compartment Inspection

Check mark

Engine Compartment Clearance

Check mark

Ensure the engine compartment is free from obstacles

Check mark

Check for the presence of combustible materials

Check mark

Remove any combustible materials found

Run this procedureArrow right

1000 Hourly / 6 Monthly In-Line Filter Replacement

Check mark

In-Line Filter Replacement, Cummins 4.5L Engine

Check mark

Caution

Check mark

Ensure disposal of lubricants and fluids meets local environmental regulations

Check mark

Replace the fuel filter at specified intervals to prevent contaminants from affecting diesel fuel flow

Check mark

Remove

Check mark

Stop the engine and allow it to cool

Check mark

Close the fuel supply valve located on the fuel sending unit

Check mark

Refer to Figure 61 for guidance

Check mark

Drain the fuel into a container and dispose in accordance with local environmental regulations

Run this procedureArrow right

1000 Hourly / 6 Monthly LPG Fuel Filter Element Replacement

Check mark

Safety Precautions

Check mark

Ensure no sparks or open flames are present in the work area

Check mark

Removal Procedure

Check mark

Close the fuel valve on the tank

Check mark

Run the engine until it stops

Check mark

Disconnect the negative battery cable

Check mark

Ensure no liquid fuel continues to flow from the connections when loosened

Check mark

Remove the bolt and seal washer retaining the top section of the fuel filter housing

Check mark

Discard the seal washer

Run this procedureArrow right

250 Hourly / 6 Monthly Engine Oil and Filter Replacement

Check mark

Preliminary 8-hour checks

Check mark

Change engine oil and engine oil filter

Check mark

Apply clean oil to the gasket of the new filter

Check mark

Install new filter

Check mark

Tighten the filter 1/2 to 3/4 turn with your hand after the gasket touches

Check mark

Start engine

Check mark

Check the area around the oil filter for leaks

Check mark

Is the oil and filter change performed at the first 100 hours of operation on new lift trucks?

Run this procedureArrow right

Parts for Hyster-Yale Lift Truck GLP110VXNGGE088

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Silicone Spray Yale

504236201

Fork Arm Caliper

150021700

Chain Scale

518096869

Small Screw Threadlock (Purple, 50 ml)

501702901

Removable Threadlock (Blue, 10 ml)

505965518

Silicone Spray Yale

504236201

Fork Arm Caliper

150021700

Chain Scale

518096869

Small Screw Threadlock (Purple, 50 ml)

501702901

Removable Threadlock (Blue, 10 ml)

505965518

Silicone Spray Yale

504236201

Fork Arm Caliper

150021700

Chain Scale

518096869

Small Screw Threadlock (Purple, 50 ml)

501702901

Removable Threadlock (Blue, 10 ml)

505965518

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Hyster-Yale

Explore Other Assets