MaintainX Asset Hub logo
EnterprisePricing
Vogt Ice

Vogt Ice Tube-Ice Machine P34 50Hz 1 1/2"

Need answers fast?
Explore the manual using AI.

Vogt Ice Tube-Ice Machine P34 50Hz 1 1/2"
Vogt Ice Tube-Ice Machine P34 50Hz 1 1/2"

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Vogt Ice Tube-Ice Machine P34 50Hz 1 1/2"

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Vogt Ice Tube-Ice Machine P34 50Hz 1 1/2"

Vogt Ice Tube-Ice Machine P34 50Hz 1 1/2"

Create an account to install this asset package.

Maintenance Plans for Vogt Ice Tube-Ice Machine Model P34 50Hz 1 1/2"

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 200 Hours Compressor Maintenance

Check mark

Oil Maintenance

Check mark

Change oil

Check mark

Check oil level in sight glass

Check mark

Is the oil level below 1/4 of the sight glass?

Check mark

Add two quarts of 300 S SU viscosity refrigeration oil if needed

Check mark

Crankcase Heater Preparation

Check mark

Energize crankcase heater for a minimum of four hours

Check mark

Check oil temperature

Check mark

Net Oil Pressure Check

Run this procedureArrow right

Cutter Height Adjustment

Check mark

Preparation

Check mark

Ensure the cutter is powered off and secured

Check mark

Gather necessary tools (straight edge, wrench, etc.)

Check mark

Initial Measurement

Check mark

Measure the length of the straight edge used (should be 30” for P24 and 40” for P34)

Check mark

Measure the clearance between the top of the cutter rim and the top of the water tank flange

Check mark

Adjustment Process

Check mark

Is the clearance within 1/8” ± 1/16”?

Check mark

Loosen the four side bolts if adjustment is necessary

Run this procedureArrow right

4000 Hourly Oil Repalcement

Check mark

Oil Level Check

Check mark

Check the oil level in the sight glass

Check mark

Is the oil level below 1/4 of the sight glass?

Check mark

Add two quarts of 300 S SU viscosity refrigeration oil if needed

Check mark

Crankcase Heater Preparation

Check mark

Ensure the crankcase heater is energized for a minimum of four hours

Check mark

Check the oil temperature

Check mark

Net Oil Pressure Check

Check mark

Record the oil pressure gauge reading

Run this procedureArrow right

Belt Replacement

Check mark

Preparation

Check mark

Remove the belt guard

Check mark

Loosen motor hold-down bolts

Check mark

Belt Removal

Check mark

Move the motor and sheave closer to the compressor until there is enough slack to remove the old belts

Check mark

Remove the old belts

Check mark

Clean the sheave groove if necessary with non-flammable, non-toxic degreasing agent or commercial detergent

Check mark

Belt Installation

Check mark

Install new belts by rotating the belt and sheaves to obtain seating in the grooves

Run this procedureArrow right

1 Monthly Cooling Tower Maintenance

Check mark

Cleaning Tasks

Check mark

Clean debris from unit

Check mark

Clean strainer and flush sump

Check mark

Clean spray nozzles

Check mark

Inspection and Adjustment

Check mark

Check fan and pump rotation

Check mark

Check belt tension

Check mark

Check for noise/vibration

Check mark

Check/adjust make-up water valve

Run this procedureArrow right

Parts for Vogt Ice Tube-Ice Machine P34 50Hz 1 1/2"

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Water Tank Assembly

19T4500S3400

Water Box Cover

19T2150C0200

5/8”-11 NC x 3” Long S.S. Stud

12A2222L11190000

5/8”-11 NC x 2” Long S.S. Stud

12A2222L11150000

2” Red Rubber Gasket

12A2600R08000000

Water Tank Assembly

19T4500S3400

Water Box Cover

19T2150C0200

5/8”-11 NC x 3” Long S.S. Stud

12A2222L11190000

5/8”-11 NC x 2” Long S.S. Stud

12A2222L11150000

2” Red Rubber Gasket

12A2600R08000000

Water Tank Assembly

19T4500S3400

Water Box Cover

19T2150C0200

5/8”-11 NC x 3” Long S.S. Stud

12A2222L11190000

5/8”-11 NC x 2” Long S.S. Stud

12A2222L11150000

2” Red Rubber Gasket

12A2600R08000000

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Vogt Ice

Explore Other Assets