MaintainX Asset Hub logo
EnterprisePricing
A.O. Smith

A.O. Smith Water Heater HWB-300

Need answers fast?
Explore the manual using AI.

A.O. Smith Water Heater HWB-300
A.O. Smith Water Heater HWB-300

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for A.O. Smith Water Heater HWB-300

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

A.O. Smith Water Heater HWB-300

A.O. Smith Water Heater HWB-300

Create an account to install this asset package.

Maintenance Plans for A.O. Smith Water Heater Model HWB-300

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Main Burner Check

Check mark

Main Burner Characteristics Check

Check mark

Verify main burner characteristics

Check mark

Is there any accumulation of lint or foreign material?

Check mark

Is there good flow of combustion and ventilating air to the unit?

Check mark

Burner Cleaning Procedure

Check mark

Turn off electrical power and close the main manual gas shutoff valve

Check mark

Allow boiler parts to cool before disassembly

Check mark

Remove main burner manifold assembly from boiler

Check mark

Remove loose foreign material with a vacuum

Run this procedureArrow right

6 Monthly Heating Surface and Vent Piping Check

Check mark

Preparation

Check mark

Turn off the electrical power, main manual gas shutoff, and pilot valves, if applicable.

Check mark

Allow boiler parts and vent to cool before disassembly.

Check mark

Disassembly and Cleaning

Check mark

Remove the boiler draft diverter and vent pipe running to the chimney.

Check mark

Check parts and chimney for obstructions and clean as necessary.

Check mark

Remove burner from boiler and other metal parts as required to clean and vacuum the heat exchanger and combustion coils.

Check mark

Refer to parts list supplied with this manual for disassembly aid.

Check mark

Reassembly

Run this procedureArrow right

6 Monthly Water and Gas Leak Check

Check mark

Pre-Inspection Preparation

Check mark

Ensure all necessary tools and safety equipment are available

Check mark

Verify that the inspection area is safe and accessible

Check mark

Water Leak Inspection

Check mark

Check for visible signs of water leaks in the following areas

Check mark

Is there any evidence of water leakage?

Check mark

Gas Leak Inspection

Check mark

Inspect for gas leaks in the following components

Check mark

Is there any smell of gas or hissing sound indicating a leak?

Run this procedureArrow right

Protector Switch Continuity Testing

Check mark

Preparation

Check mark

Ensure the protector switch reset button is not depressed

Check mark

Remove the leads from the switch from the thermocouple function block

Check mark

Attach the leads from the switch to the leads from a test flashlight

Check mark

Testing with Flashlight

Check mark

Turn on the flashlight. Does the lamp light up?

Check mark

If Lamp Does Not Light

Check mark

Depress reset button on switch. Does the lamp light up?

Check mark

If the lamp does not light, identify the issue

Run this procedureArrow right

2 Monthly Water Heater Cleaning

Check mark

Preparation

Check mark

Shut off electric and gas supply to the unit

Check mark

Close gate valves 'A' and 'B'

Check mark

Open drain cock and drain unit

Check mark

Scale Removal Setup

Check mark

Remove pressure relief valve from outlet header assembly and install drain hose assembly

Check mark

Install standpipe in tee of inlet line

Check mark

Close drain cock

Check mark

Deliming Process

Run this procedureArrow right

Parts for A.O. Smith Water Heater HWB-300

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from A.O. Smith

Explore Other Assets