

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

A.O. Smith Water Heater HW-670 Propane
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial Circulator Pump Lubrication
Pre-Lubrication Check
Ensure the circulator pump is turned off
Verify that the oil tube is available and in good condition
Lubrication Process
Identify and locate the oil cups
Add 2 or 3 teaspoons of No. 20 non-detergent motor oil to the bearing oil cups
Add 10 or 12 drops of No. 20 non-detergent motor oil to the motor oil cups
Post-Lubrication Check
Is there any oil leakage around the oil cups?
6 Monthly Pilot Flame Check
Pilot Burner - Electronic Ignition
Open fused disconnect switch or shut off electrical power to the boiler.
Turn the gas valve control knob counterclockwise to the 'PILOT' position.
Close fused disconnect switch to restore electrical power to the boiler.
Did the pilot ignite with the combination gas valve knob set at 'PILOT' and the system calling for heat?
Adjust pilot flame to cover 3/8" to 1/2" (10-12mm) of the sensing probe tip.
Did the main burner fail to light after pilot ignition?
Check the following if the main burner fails to light
Is electrical power and gas present at the valve but it does not open when system calls for heat?
6 Monthly Safety Relief Valve Check
Pre-Check Precautions
Ensure a drain line is attached to the valve to direct discharge to an open drain.
Valve Operation Check
Lift the lever at the end of the valve several times to ensure it seats properly and operates freely.
Post-Check Observations
Does the relief valve discharge periodically or continuously?
If the valve discharges, describe the potential cause (e.g., thermal expansion or faulty valve).
Hydronic and Heating System Cleaning
Preparation
Ensure the boiler is turned off and cooled down before starting the cleaning process.
Verify that all necessary cleaning equipment and solutions are available.
Initial System Flush
Drain the existing water from the system completely.
Inspect the drained water for contaminants and note any unusual findings.
Cleaning Solution Application
Calculate the approximate water volume of the system to determine the correct percentage of cleaning solution needed.
Add the appropriate amount of cleaning solution to the system.
Closed Circuit Testing
Thermocouple Testing
Attach the leads from a millivolt meter to the thermocouple and junction block and record the reading
Is the thermocouple reading above 14 to 18 millivolts?
Voltage Supply Testing
Transfer the lead on the junction block to other terminal and record the reading
Is the voltage supply reading between 8 to 14 millivolts?
Check the junction block connections and the protector switch leads if the reading is less than 8 millivolts
Millivolt Drop Measurement
Measure the millivolt drop across the contacts
Access the parts list for your equipment in MaintainX.
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













