

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

A.O. Smith Water Heater HWB-670 Natural
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Heating Surface and Vent Piping Check
Preparation
Turn off the electrical power, main manual gas shutoff, and pilot valves (if applicable).
Allow boiler parts and vent to cool before disassembly.
Disassembly and Cleaning
Remove the boiler draft diverter and vent pipe running to the chimney.
Check parts and chimney for obstructions and clean as necessary.
Remove burner from boiler and other metal parts as required to clean and vacuum the heat exchanger and combustion coils.
Refer to parts list supplied with this manual for disassembly aid.
Reassembly
6 Monthly Safety Relief Valve Check
Pre-Check Precautions
Ensure a drain line is attached to the valve to direct discharge to an open drain
Valve Operation Check
Lift the lever at the end of the valve several times
Post-Check Observations
Did the valve seat properly and operate freely?
Is the valve discharging periodically or continuously?
Potential Issues
Identify possible causes if the valve is discharging
6 Monthly Pilot Flame Check
Pilot Burner - Electronic Ignition
Open fused disconnect switch or shut off electrical power to the boiler.
Turn the gas valve control knob counterclockwise to the 'PILOT' position.
Close fused disconnect switch to restore electrical power to the boiler.
Did the pilot ignite with the combination gas valve knob set at 'PILOT' and the system calling for heat?
Adjust pilot flame to cover 3/8" to 1/2" (10-12mm) of the sensing probe tip.
Did the main burner fail to light after pilot ignition?
Check the following if the main burner fails to light
Replace valve if electrical power and gas are present but the valve does not open when system calls for heat.
Venting System Visual Inspection
Pre-Inspection Safety Measures
Ensure the boiler is not connected to a common vent or chimney with solid fuel burning equipment.
Verify that the equipment room is not under negative pressure.
Venting System Inspection
Inspect the venting system for the following issues
Post-Inspection Verification
Is there sufficient supply and ventilation air in the equipment room?
Confirm that no unsafe conditions were identified during the inspection.
6 Monthly Main Burner Check
Main Burner Characteristics Check
Verify main burner characteristics
Is there any accumulation of lint or foreign material blocking air openings?
Is there good flow of combustion and ventilating air to the unit?
Maintain a clear area around the boiler
Burner Cleaning Procedure
Turn off electrical power and close the main manual gas shutoff valve
Allow boiler parts to cool before disassembly
Remove main burner manifold assembly from boiler
Access the parts list for your equipment in MaintainX.
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













