Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

A.O. Smith Water Heater HWB-670 Propane
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Pilot Flame Check
Pilot Burner - Electronic Ignition
Open fused disconnect switch or shut off electrical power to the boiler.
Turn the gas valve control knob counterclockwise to the 'PILOT' position.
Close fused disconnect switch to restore electrical power to the boiler.
Did the pilot ignite with the combination gas valve knob set at 'PILOT' and the system calling for heat?
Adjust pilot flame to cover 3/8" to 1/2" (10-12mm) of the sensing probe tip.
Did the main burner light after the pilot burner ignited?
If the main burner fails to light, check the following:
Replace valve if electrical power and gas are present but the valve does not open when system calls for heat.
Closed Circuit Testing
Thermocouple Testing
Attach the leads from a millivolt meter to the thermocouple and junction block and record the reading
Is the thermocouple reading above 14 to 18 millivolts?
Voltage Supply Testing
Transfer the lead on the junction block to other terminal and record the reading
Is the voltage supply reading between 8 to 14 millivolts?
If the reading is less than 8 millivolts, describe the issues found with the junction block connections and protector switch leads
Millivolt Drop Measurement
Measure the millivolt drop across the contacts
4 Monthly Circulator Pump Lubrication
Initial Lubrication
Oil the three oil cups (2 on the motor, 1 on the pump) as instructed on the oil tube supplied with the unit.
Was the circulator oiled before operation?
Regular Lubrication
Lubricate the three oil cups at least once every four months during the heating season.
Lubricate combination heating-cooling systems every four months year-round.
Oil Application
Enter the amount of oil used in bearing oil cups (in teaspoons).
Enter the amount of oil used in motor oil cups (in drops).
6 Monthly Water and Gas Leak Check
Leak Inspection
Check for visible water leaks
Check for visible gas leaks
Boiler and Controls Inspection
Inspect boiler mounted gas controls for proper operation
Inspect boiler mounted electrical controls for proper operation
Additional Recommendations
Is a more frequent inspection necessary based on water conditions?
Notes or observations from the inspection
Initial Circulator Pump Lubrication
Pre-Lubrication Check
Ensure the circulator pump is not in operation
Verify the oil tube is supplied with the unit
Lubrication Process
Identify the oil cups to be lubricated
Add 2 or 3 teaspoons of No. 20 non-detergent motor oil to the bearing oil cups
Add 10 or 12 drops of No. 20 non-detergent motor oil to the motor oil cups
Post-Lubrication Check
Was the lubrication process completed successfully?
Access the parts list for your equipment in MaintainX.
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX