MaintainX Asset Hub logo
EnterprisePricing
A.O. Smith

A.O. Smith Water Heater HW-399

Need answers fast?
Explore the manual using AI.

A.O. Smith Water Heater HW-399
A.O. Smith Water Heater HW-399

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for A.O. Smith Water Heater HW-399

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

A.O. Smith Water Heater HW-399

A.O. Smith Water Heater HW-399

Create an account to install this asset package.

Maintenance Plans for A.O. Smith Water Heater Model HW-399

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Water and Gas Leak Check

Check mark

Pre-Inspection Preparation

Check mark

Ensure all necessary tools and safety equipment are available

Check mark

Review safety protocols for handling gas and water leaks

Check mark

Water Leak Inspection

Check mark

Inspect all visible pipes for signs of water leakage

Check mark

Is there any visible water leakage?

Check mark

Describe the location and extent of any water leaks found

Check mark

Gas Leak Inspection

Check mark

Check for the smell of gas near the boiler and gas lines

Run this procedureArrow right

Initial Circulator Pump Lubrication

Check mark

Pre-Lubrication Check

Check mark

Ensure the circulator pump is turned off

Check mark

Verify that the oil tube is available and in good condition

Check mark

Lubrication Process

Check mark

Identify the oil cups to be lubricated

Check mark

Add 2 or 3 teaspoons of No. 20 non-detergent motor oil to the pump oil cup

Check mark

Add 10 or 12 drops of No. 20 non-detergent motor oil to each motor oil cup

Check mark

Post-Lubrication Check

Check mark

Was the lubrication process completed successfully?

Run this procedureArrow right

6 Monthly Heating Surface and Vent Piping Check

Check mark

Preparation

Check mark

Turn off the electrical power, main manual gas shutoff, and pilot valves (if applicable).

Check mark

Allow boiler parts and vent to cool before disassembly.

Check mark

Disassembly and Cleaning

Check mark

Remove the boiler draft diverter and vent pipe running to the chimney.

Check mark

Check parts and chimney for obstructions and clean as necessary.

Check mark

Remove burner from boiler and other metal parts as required to clean and vacuum the heat exchanger and combustion coils.

Check mark

Refer to parts list supplied with this manual for disassembly aid.

Check mark

Reassembly

Run this procedureArrow right

6 Monthly Low Water Cutoff Maintenance

Check mark

Inspection of Safety Devices

Check mark

Inspect the operation of all safety devices including low water cutoffs

Check mark

Is more frequent inspection required based on water conditions?

Check mark

Flushing of Low Water Cutoff Device

Check mark

Flush the low water cutoff device of the float type

Run this procedureArrow right

Venting System Visual Inspection

Check mark

Pre-Inspection Safety Measures

Check mark

Ensure the boiler is not connected to a common vent or chimney with solid fuel burning equipment.

Check mark

Verify that the equipment room is not under negative pressure.

Check mark

Venting System Inspection

Check mark

Inspect the venting system for the following issues

Check mark

Post-Inspection Verification

Check mark

Is there sufficient supply and ventilation air in the equipment room?

Check mark

Confirm that no unsafe conditions were identified during the inspection.

Run this procedureArrow right

Parts for A.O. Smith Water Heater HW-399

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from A.O. Smith

Explore Other Assets