MaintainX Asset Hub logo
EnterprisePricing
A.O. Smith

A.O. Smith Water Heater HWB-610 Natural

Need answers fast?
Explore the manual using AI.

A.O. Smith Water Heater HWB-610 Natural
A.O. Smith Water Heater HWB-610 Natural

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for A.O. Smith Water Heater HWB-610 Natural

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

A.O. Smith Water Heater HWB-610 Natural

A.O. Smith Water Heater HWB-610 Natural

Create an account to install this asset package.

Maintenance Plans for A.O. Smith Water Heater Model HWB-610 Natural

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Heating Surface and Vent Piping Check

Check mark

Preparation

Check mark

Turn off the electrical power, main manual gas shutoff, and pilot valves, if applicable.

Check mark

Allow boiler parts and vent to cool before disassembly.

Check mark

Disassembly and Cleaning

Check mark

Remove the boiler draft diverter and vent pipe running to the chimney.

Check mark

Check parts and chimney for obstructions and clean as necessary.

Check mark

Remove burner from boiler and other metal parts as required to clean and vacuum the heat exchanger and combustion coils.

Check mark

Reassembly

Check mark

Reinstall the parts removed in steps 2 and 3.

Run this procedureArrow right

Protector Switch Continuity Testing

Check mark

Preparation

Check mark

Ensure the protector switch reset button is not depressed

Check mark

Remove leads from the switch and attach to test flashlight leads

Check mark

Testing with Model N22T Test Kit

Check mark

Turn on the flashlight

Check mark

Does the lamp light up?

Check mark

If Lamp Does Not Light

Check mark

Are the protector switch contacts open?

Check mark

Depress reset button on switch if water temperature is below 200°F

Run this procedureArrow right

Initial Circulator Pump Lubrication

Check mark

Pre-Lubrication Check

Check mark

Ensure the circulator pump is turned off

Check mark

Verify that the oil tube is available and in good condition

Check mark

Lubrication Process

Check mark

Identify the oil cups to be lubricated

Check mark

Add 2 or 3 teaspoons of No. 20 non-detergent motor oil to the pump oil cup

Check mark

Add 10 or 12 drops of No. 20 non-detergent motor oil to each motor oil cup

Check mark

Post-Lubrication Check

Check mark

Is there any oil leakage around the cups?

Run this procedureArrow right

6 Monthly Safety Relief Valve Check

Check mark

Pre-Check Precautions

Check mark

Ensure a drain line is attached to the valve to direct discharge to an open drain.

Check mark

Valve Operation Check

Check mark

Lift the lever at the end of the valve several times to ensure it seats properly and operates freely.

Check mark

Post-Check Observations

Check mark

Did the relief valve discharge periodically or continuously?

Check mark

If the valve discharged, describe the potential cause (e.g., thermal expansion or faulty valve).

Run this procedureArrow right

2 Monthly Water Heater Cleaning

Check mark

Preparation

Check mark

Shut off electric and gas supply to the unit

Check mark

Close gate valves 'A' and 'B'

Check mark

Open drain cock and drain unit

Check mark

Scale Removal Setup

Check mark

Remove pressure relief valve from outlet header assembly and install drain hose assembly

Check mark

Install standpipe in tee of inlet line

Check mark

Close drain cock

Check mark

Deliming Process

Run this procedureArrow right

Parts for A.O. Smith Water Heater HWB-610 Natural

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Safety Flow Switch Package

211480

Thermal Balancer

98190

Tank Fitting 2"

94447

Tank Fitting 2-1/2"

94447-1

Tank Fitting 3"

94447-2

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from A.O. Smith

Explore Other Assets