

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

A.O. Smith Water Heater HWB-610 Propane
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Closed Circuit Testing
Thermocouple Testing
Attach the leads from a millivolt meter to the thermocouple and junction block and record the reading
Is the thermocouple reading above 14 to 18 millivolts?
Voltage Supply Testing
Transfer the lead on the junction block to other terminal and record the reading
Is the voltage supply reading between 8 to 14 millivolts?
If the reading is less than 8 millivolts, describe the issues found with the junction block connections and protector switch leads
Millivolt Drop Measurement
Enter the millivolt drop across the contacts
6 Monthly Pilot Flame Check
Pilot Burner - Electronic Ignition
Open fused disconnect switch or shut off electrical power to the boiler.
Turn the gas valve control knob counterclockwise to the 'PILOT' position.
Close fused disconnect switch to restore electrical power to the boiler.
Did the pilot ignite with the combination gas valve knob set at 'PILOT' and the system calling for heat?
Adjust pilot flame to cover 3/8" to 1/2" (10-12mm) of the sensing probe tip.
Did the main burner light after pilot ignition?
If the main burner fails to light, check the following:
Replace valve if electrical power and gas are present but the valve does not open when system calls for heat.
6 Monthly Main Burner Check
Main Burner Characteristics Check
Verify main burner characteristics
Is there any accumulation of lint or foreign material?
Is there good flow of combustion and ventilating air to the unit?
Preparation for Cleaning
Turn off the electrical power and close the main manual gas shutoff valve.
Allow boiler parts to cool before disassembly?
Cleaning Procedure
Remove main burner manifold assembly from boiler.
Hydronic and Heating System Cleaning
Preparation
Ensure the boiler is turned off and cooled down
Verify that all necessary cleaning solutions and tools are available
Initial System Flush
Drain the existing water from the system
Inspect the drained water for contaminants
Cleaning Solution Application
Calculate the proper percentage of cleaning solution based on system water volume
Add the cleaning solution to the system
4 Monthly Circulator Pump Lubrication
Initial Lubrication Before Operation
Oil the three oil cups (2 on the motor, 1 on the pump) as instructed on the oil tube supplied with the unit.
Regular Lubrication During Heating Season
Lubricate the three oil cups at least once every four months.
Ensure lubrication of the following oil cups
Lubrication for Combination Heating-Cooling Systems
Lubricate the three oil cups every four months year-round.
Oil Quantity and Type
Use 2 or 3 teaspoonsful in bearing oil cups.
Access the parts list for your equipment in MaintainX.
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
Safety Flow Switch Package
211480
Thermal Balancer
98190
Tank Fitting 2"
94447
Tank Fitting 2-1/2"
94447-1
Tank Fitting 3"
94447-2
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













