

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Vogt Ice Tube-Ice Machine P34 60Hz 1"
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
V-Belt Maintenance
Cleaning the V-Belt
Wipe the belt with a dry cloth
Wash the belt with soap and water
Rinse the belt well
Ensure belt is free of oil and protected from sunlight
Checking and Adjusting Belt Tension
Apply 50-75 pounds of deflection force across the belt
Measure the deflection using a straight edge
Is the deflection between 5/8” to 3/4”?
1 Weekly Tube-Ice Machine Maintenance
Weekly Checks
Check all belts for proper tension
Ensure no belt dressings are used
Check for leaks after 400 hours or four weeks of operation
Water Distributors Maintenance
Inspection of Water Distributors
Is the view through the plastic freezer cover clear for inspection?
Is there irregularity in the inside diameter of a large portion of the ice?
Is some of the ice opaque?
Is there a noticeable decrease in ice capacity and quality?
Closer Inspection Procedure
Stop the unit.
Remove the nuts and retaining ring sections.
Lift off the top cover.
Cutter Ring Gear Replacement
Remove the water tank assembly
Remove the cutter assembly from the cutter shaft
Remove the drive pins holding the ring gear to the cutter bank
Drive off the ring gear progressively and uniformly
Inspect and clean the cutter bank
Attempt to fit the new gear onto the cutter
Heat the ring gear uniformly to 300 - 400°F (150 - 205°C)
Align and set the ring gear onto the cutter
Drill holes in the valley of the ring gear and install drive pins
1 Monthly Cutter Gear Reducer Inspection
Safety Precautions
Follow all lock-out and tag-out procedures before servicing any electrical equipment
Oil Level Inspection
Check for any evidence of oil leakage
Check the oil level at the pipe plug in the side of the gear housing
Does oil run out of the hole when the plug is taken out?
Oil Refill
Is the oil level low?
Add oil through one of the top plugged holes if the oil level is low
Access the parts list for your equipment in MaintainX.
Water Tank Assembly
19T4500S3400
Water Box Cover
19T2150C0200
5/8”-11 NC x 3” Long S.S. Stud
12A2222L11190000
5/8”-11 NC x 2” Long S.S. Stud
12A2222L11150000
2” Red Rubber Gasket
12A2600R08000000
Water Tank Assembly
19T4500S3400
Water Box Cover
19T2150C0200
5/8”-11 NC x 3” Long S.S. Stud
12A2222L11190000
5/8”-11 NC x 2” Long S.S. Stud
12A2222L11150000
2” Red Rubber Gasket
12A2600R08000000
Water Tank Assembly
19T4500S3400
Water Box Cover
19T2150C0200
5/8”-11 NC x 3” Long S.S. Stud
12A2222L11190000
5/8”-11 NC x 2” Long S.S. Stud
12A2222L11150000
2” Red Rubber Gasket
12A2600R08000000
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













