Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZXE09E2A3AA1A111A2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Gas Piping Cleaning
WARNING!
Pipe Assembly
Use special pipe dope for assembly
Pipe Cleaning
Clean piping of dirt and scale by hammering on the outside of the pipe
Blow out loose particles from the pipe
Initial Start-up Preparation
Ensure all gas lines external to the unit have been purged of air
Burner Replacement
Preparation
Close main manual shut-off valve
Shut off all power to the unit
Disassembly
Open the union fitting upstream of the unit gas valve and downstream from the main manual shut-off valve
Remove screws holding each end of the manifold to the manifold supports
Disconnect wiring to the gas valve
Remove the manifold & gas valve assembly
Inspection and Replacement
Initial 10 Hours Belt Tension Check
Blower System Adjustment
Adjust blower speed to specific static and CFM requirements
Adjust belt tension to specific static and CFM requirements
Sheave and Pulley Alignment
Verify proper sheave alignment
Tighten blower pulley set screws
Tighten motor sheave set screws
Post-Adjustment Verification
Re-check set screws after 10-12 hours run time
Supply Air Drive Maintenance
Caution
Review installation for errors, leaks, or undesirable system effects
Are there any installation errors, leaks, or undesirable system effects?
Document the issues found during the review
Enter the measured CFM at unit start-up
Enter the required CFM
Enter the existing datum diameter (DD) of the variable pitch motor sheave
Calculate the new datum diameter (DD)
Is the new datum diameter (DD) calculated correctly?
Manifold Gas Pressure Maintenance
Preparation
Turn off all power to the unit
Connect a manometer to the outlet pressure port on the gas valve
Adjustment of Pressure Screws
Remove cover screws covering HI and LO pressure adjustment screws
Turn on power to the unit
Second Stage Pressure Adjustment
Set thermostat to call for second stage heat and start furnace
Enter the current manifold pressure for second stage
Access the parts list for your equipment in MaintainX.
Flue Extension Kit
1FE0416
Roof Curb
1RC0458
Roof Curb
1RC0456
Thru the Base Electrical and Thru the Curb Gas
1TB0401
Thru the Base Electrical and Thru the Curb Gas
1TB0402
Flue Extension Kit
1FE0416
Roof Curb
1RC0458
Roof Curb
1RC0456
Thru the Base Electrical and Thru the Curb Gas
1TB0401
Thru the Base Electrical and Thru the Curb Gas
1TB0402
Flue Extension Kit
1FE0416
Roof Curb
1RC0458
Roof Curb
1RC0456
Thru the Base Electrical and Thru the Curb Gas
1TB0401
Thru the Base Electrical and Thru the Curb Gas
1TB0402
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX