Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZT061N00A2A1AAA1A1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 10 Hours Set Screws Check
Blower System Adjustments
Adjust blower speed to specific static and CFM requirements
Adjust belt tension as required
Sheave and Pulley Verification
Verify proper sheave alignment
Tighten blower pulley set screws
Tighten motor sheave set screws
Post-Adjustment Check
Were the set screws re-checked after 10-12 hours of run time?
Blower Rotation Check
Initial Inspection
Verify that the unit is properly phased at the factory.
Is the blower rotating in the correct direction?
Compressor Rotation Check
Is the compressor rotating in the correct direction?
Measure the amperage of the scroll compressor.
Is the scroll compressor drawing low amperage?
Are the suction and discharge pressures similar?
Is the scroll compressor producing a high noise level?
Initial Equipment Inspection
Visual Inspection
Inspect the unit for visible damage during transit
Note the extent of any damage on the carrier’s freight bill
Request inspection by the carrier’s agent in writing
Installation Compliance
Ensure installation complies with all applicable codes
Gas Supply System Testing
Is the furnace disconnected from the gas supply piping system?
Enter the pressure used for testing the gas supply piping system
Manifold Gas Pressure Maintenance
Preparation
Turn off all power to the unit
Connect a manometer to the outlet pressure port on the gas valve to monitor the manifold pressure
Adjustment Screw Access
Remove cover screws covering HI and LO pressure adjustment screws
Turn on power to the unit
Second Stage Pressure Adjustment
Set thermostat to call for second stage heat and start furnace
Is the second stage manifold pressure within 3.5 IWG ± 0.3?
Joints Leaks Check
WARNING!
Gas Connection and Pressure Check
Open the main shut-off valve to admit normal gas pressure to the mains.
Leak Detection
Check all joints for leaks using soap solution or other suitable material. NEVER USE A FLAME.
Were any leaks detected?
WARNING!
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX