Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZT037P00A2A1AAA1A1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Gas Piping Cleaning
WARNING!
Pipe Cleaning
Clean all piping of dirt and scale by hammering on the outside of the pipe.
Blow out loose particles from the piping.
Pre-Start-Up Checks
Have all gas lines external to the unit been purged of air?
Supply Air Drive Maintenance
Caution
Review installation for errors, leaks, or undesirable effects
Measure current CFM
Calculate new datum diameter (DD)
Adjust the variable pitch motor sheave to the new DD
Verify blower speed changes adhere to fan laws
Check for changes in static pressure and BHP
Confirm AMP draw of the blower motor is within limits
Record any issues or observations
Manifold Gas Pressure Maintenance
Preparation
Turn off all power to the unit
Connect a manometer to the outlet pressure port on the gas valve to monitor the manifold pressure
Adjustment Screw Access
Remove cover screws covering HI and LO pressure adjustment screws
Turn on power to the unit
Second Stage Pressure Adjustment
Set thermostat to call for second stage heat and start furnace
Is the second stage manifold pressure within 3.5 IWG ± 0.3?
Burner Replacement
Preparation
Close main manual shut-off valve
Shut off all power to the unit
Disassembly
Open the union fitting upstream of the unit gas valve and downstream from the main manual shut-off valve
Remove screws holding each end of the manifold to the manifold supports
Disconnect wiring to the gas valve
Remove the manifold & gas valve assembly
Inspection and Replacement
Joints Leaks Check
WARNING!
Preparation
Ensure all necessary safety equipment is worn
Verify that the main shut-off valve is closed before starting
Gas Connection Completion
Use a special pipe dope for assembling wrought iron or steel pipe
Select the compound used for assembly
Leak Testing
Open the main shut-off valve to admit normal gas pressure
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













