Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZR102N10A2AAA50124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Burner Replacement
Preparation
Close main manual shut-off valve
Shut off all power to the unit
Disassembly
Open the union fitting upstream of the unit gas valve
Remove screws holding manifold to supports
Disconnect wiring to the gas valve
Remove manifold & gas valve assembly
Inspection and Replacement
Filter Cleaning
Filter Inspection and Cleaning
Check that all filters are in place
Are the filters clean?
Clean the filters if dirty
Replace filters if necessary
Filter Installation
Ensure filters are installed ahead of evaporator coil
Verify filters are of the correct size and type
Post-Cleaning Check
Initial Equipment Inspection
Visual Inspection
Inspect the unit for visible damage during transit
Note the extent of any damage on the carrier’s freight bill
Carrier Inspection Request
Request inspection by the carrier’s agent in writing
Gas Supply Safety Measures
Is the furnace and its individual shut-off valve disconnected from the gas supply piping system?
Is the furnace isolated from the gas supply piping system by closing its individual manual shut-off valve?
Pressure Testing Precautions
Manifold Gas Pressure Maintenance
Preparation
Turn off all power to the unit
Connect a manometer to the outlet pressure port on the gas valve
Access Adjustment Screws
Remove cover screws covering HI and LO pressure adjustment screws
Turn on power to the unit
Adjust Second Stage Pressure
Set thermostat to call for second stage heat and start furnace
Enter the current manifold pressure for second stage (100% input)
Supply Air Drive Maintenance
Review installation for errors, leaks, or undesirable system effects
Check blower speed changes for substantial changes in static pressure and BHP
Ensure only qualified personnel make blower speed changes
Measure the current CFM
Calculate the new datum diameter (DD)
Adjust the variable pitch motor sheave to the new DD
Verify the new blower speed adheres to fan laws
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX