MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZR102C00A2AAA50124A

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZR102C00A2AAA50124A
York Single Package Air Conditioner ZR102C00A2AAA50124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZR102C00A2AAA50124A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZR102C00A2AAA50124A

York Single Package Air Conditioner ZR102C00A2AAA50124A

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZR102C00A2AAA50124A

Integrate maintenance plans directly into your work orders in MaintainX.

Manifold Gas Pressure Maintenance

Check mark

Preparation

Check mark

Turn off all power to the unit

Check mark

Connect a manometer to the outlet pressure port on the gas valve to monitor the manifold pressure

Check mark

Access Adjustment Screws

Check mark

Remove cover screws covering HI and LO pressure adjustment screws

Check mark

Turn on power to the unit

Check mark

Adjust Second Stage Pressure

Check mark

Set thermostat to call for second stage heat and start furnace

Check mark

Is the second stage manifold pressure within 3.5 IWG ± 0.3?

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection and Cleaning

Check mark

Check that all filters are in place

Check mark

Inspect filters for dirt and debris

Check mark

Are the filters clean?

Check mark

Clean or replace dirty filters

Check mark

Evaporator Coil Check

Check mark

Ensure filters are installed ahead of evaporator coil

Check mark

Unit Operation Check

Check mark

Is the unit operating with filters properly installed?

Run this procedureArrow right

Joints Leaks Check

Check mark

WARNING!

Check mark

Gas Connection and Pressure Check

Check mark

Open the main shut-off valve to admit normal gas pressure to the mains.

Check mark

Check all joints for leaks using soap solution or other suitable material

Check mark

WARNING!

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Inspection

Check mark

Verify factory phasing of Predator® units

Check mark

Is the blower rotating in the correct direction?

Check mark

Is the compressor rotating in the correct direction?

Check mark

Misphasing Correction

Check mark

Is the electrical connection to the unit misphased?

Check mark

Change the phasing of the Field Line Connection at the factory or field supplied disconnect to obtain proper rotation

Check mark

Scroll Compressor Check

Check mark

Is the scroll compressor drawing low amperage?

Run this procedureArrow right

Initial 10 Hours Set Screws Check

Check mark

Blower System Adjustment

Check mark

Adjust blower speed to specific static and CFM requirements

Check mark

Adjust belt tension as required

Check mark

Set Screws Tightening

Check mark

Tighten blower pulley set screws

Check mark

Tighten motor sheave set screws

Check mark

Post Adjustment Check

Check mark

Have the set screws been re-checked after 10-12 hours of run time?

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZR102C00A2AAA50124A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets