MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZJ078N24R4B5EAA1A3

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZJ078N24R4B5EAA1A3
York Single Package Air Conditioner ZJ078N24R4B5EAA1A3

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZJ078N24R4B5EAA1A3

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZJ078N24R4B5EAA1A3

York Single Package Air Conditioner ZJ078N24R4B5EAA1A3

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZJ078N24R4B5EAA1A3

Integrate maintenance plans directly into your work orders in MaintainX.

Joints Leaks Check

Check mark

WARNING!

Check mark

Gas Connection and Pressure Check

Check mark

Open the main shut-off valve to admit normal gas pressure to the mains.

Check mark

Leak Detection

Check mark

Check all joints for leaks using soap solution or other suitable material. NEVER USE A FLAME.

Check mark

Was a commercially available soap solution used for leak detection?

Check mark

WARNING!

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A

Check mark

Adjust by turning (B)

Check mark

Ensure nuts (C) are not loosened

Check mark

Measure deflection distance using belt tension checker

Check mark

Determine deflection distance from normal position

Check mark

Check belt tension

Check mark

Re-tighten nuts (A) after adjustment

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Cleaning

Check mark

Clean all piping of dirt and scale by hammering on the outside of the pipe.

Check mark

Blow out loose particles from the piping.

Check mark

Pre-Start-Up Check

Check mark

Have all gas lines external to the unit been purged of air?

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Visual Inspection

Check mark

Inspect the unit for possible damage during transit

Check mark

Is there any evident damage?

Check mark

Note the extent of the damage on the carrier’s freight bill

Check mark

Carrier Inspection Request

Check mark

Request inspection by the carrier’s agent in writing

Check mark

Installation Compliance Check

Check mark

Ensure installation complies with enclosed instructions and applicable codes

Check mark

Gas Supply System Testing

Run this procedureArrow right

Manifold Gas Pressure Maintenance

Check mark

Turn off all power to the unit

Check mark

Connect a manometer to the outlet pressure port on the gas valve

Check mark

Remove plastic cap covering HI and LO pressure adjustment screws

Check mark

Turn on power to the unit

Check mark

Set thermostat to call for second stage heat and start furnace

Check mark

Adjust second stage (100% input) pressure

Check mark

Enter the current manifold pressure for second stage

Check mark

Is the manifold pressure within the range of 3.2 to 3.8 IWG?

Check mark

Adjust the second stage adjustment screw if necessary

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZJ078N24R4B5EAA1A3

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Ducted Systems Gas Piping Accessory Kit (Nipples, Fittings, and Gas Cock)

1GP0405

LP Gas Conversion Kit

1NP0442

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

Ducted Systems Gas Piping Accessory Kit (Nipples, Fittings, and Gas Cock)

1GP0405

LP Gas Conversion Kit

1NP0442

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

Ducted Systems Gas Piping Accessory Kit (Nipples, Fittings, and Gas Cock)

1GP0405

LP Gas Conversion Kit

1NP0442

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets