Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZJ090C24R4B5EAA1A1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Burner and Orifice Inspection
Ensure main manual shut-off valve is closed and all power to the unit is shut off
Open the union fitting just upstream of the unit gas valve and downstream from the main manual shut-off valve in the gas supply line
Remove the screws holding each end of the manifold to the manifold supports
Disconnect wiring to the gas valves and spark igniters
Remove the manifold & gas valve assembly
Inspect and/or replace orifices
Remove the heat shield on top of the manifold supports to access burners
Inspect and/or replace burners
Ensure burners are level and seated at the rear of the gas orifice
Filter Cleaning
Filter Inspection and Cleaning
Check that all filters are in place and clean
Are the filters clean and undamaged?
Clean or replace filters if necessary
Evaporator Coil Check
Ensure filters are installed ahead of evaporator coil
Operational Safety Check
Is the unit operating with filters properly installed?
Ensure panel latches are properly positioned for an airtight seal
Joints Leaks Check
Safety Precautions
Ensure no open flames are present in the area.
Use only approved pipe dope for assembling pipes.
Approved compounds for pipe assembly
Gas Pressure and Leak Detection
Open the main shut-off valve to admit normal gas pressure to the mains.
Check all joints for leaks using a soap solution or other suitable material.
Were any leaks detected during the inspection?
Post Inspection
Manifold Gas Pressure Maintenance
Preparation
Turn off all power to the unit
Connect a manometer to the outlet pressure port on the gas valve
Adjustment of Second Stage Pressure
Remove plastic cap covering HI and LO pressure adjustment screws
Turn on power to the unit
Set thermostat to call for second stage heat and start furnace
Adjust second stage (HI) manifold pressure
Is the second stage manifold pressure within 3.5 IWG ± 0.3?
Blower Rotation Check
Initial Inspection
Verify that the unit is properly phased at the factory.
Is the blower rotating in the correct direction?
Compressor Rotation Check
Is the compressor rotating in the correct direction?
Measure the amperage of the scroll compressor.
Are the suction and discharge pressures normal?
Is the noise level of the scroll compressor normal?
Phasing Correction
Access the parts list for your equipment in MaintainX.
Ducted Systems Gas Piping Accessory Kit (Nipples, Fittings, and Gas Cock)
1GP0405
LP Gas Conversion Kit
1NP0442
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
Ducted Systems Gas Piping Accessory Kit (Nipples, Fittings, and Gas Cock)
1GP0405
LP Gas Conversion Kit
1NP0442
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
Ducted Systems Gas Piping Accessory Kit (Nipples, Fittings, and Gas Cock)
1GP0405
LP Gas Conversion Kit
1NP0442
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.