MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZR090N15A2AAA50124A

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZR090N15A2AAA50124A
York Single Package Air Conditioner ZR090N15A2AAA50124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZR090N15A2AAA50124A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZR090N15A2AAA50124A

York Single Package Air Conditioner ZR090N15A2AAA50124A

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZR090N15A2AAA50124A

Integrate maintenance plans directly into your work orders in MaintainX.

Joints Leaks Check

Check mark

WARNING!

Check mark

Gas Connection and Pressure Check

Check mark

Open the main shut-off valve to admit normal gas pressure to the mains.

Check mark

Leak Detection

Check mark

Check all joints for leaks using soap solution or other suitable material. NEVER USE A FLAME.

Check mark

WARNING!

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A

Check mark

Adjust by turning (B)

Check mark

Ensure nuts (C) are not loosened

Check mark

Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span

Check mark

Enter the deflection distance obtained

Check mark

Use a straight edge from sheave to sheave as reference line to determine the deflection distance from normal position

Check mark

Record the recommended deflection force for the belt section

Check mark

Check the belt tension at least two times during the first 24 hours of operation

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Visual Inspection

Check mark

Inspect the unit for visible damage during transit

Check mark

Note the extent of any damage on the carrier’s freight bill

Check mark

Carrier Inspection Request

Check mark

Request inspection by the carrier’s agent in writing

Check mark

Gas Supply Safety Precautions

Check mark

Is the furnace disconnected from the gas supply piping system?

Check mark

Is the gas valve replaced if subjected to pressure greater than 1/2 PSIG?

Check mark

Is the furnace isolated from the gas supply piping system?

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection and Cleaning

Check mark

Check that all filters are in place

Check mark

Inspect filters for dirt and debris

Check mark

Are the filters clean?

Check mark

Filter Replacement

Check mark

Do the filters need replacement?

Check mark

Replace filters with the same size and type

Check mark

Post Maintenance Check

Check mark

Ensure filters are installed ahead of evaporator coil

Run this procedureArrow right

Manifold Gas Pressure Maintenance

Check mark

Preparation

Check mark

Turn off all power to the unit

Check mark

Connect a manometer to the outlet pressure port on the gas valve

Check mark

Access Adjustment Screws

Check mark

Remove cover screws covering HI and LO pressure adjustment screws

Check mark

Turn on power to the unit

Check mark

Adjust Second Stage Pressure

Check mark

Set thermostat to call for second stage heat and start furnace

Check mark

Enter the current manifold pressure for second stage (100% input)

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZR090N15A2AAA50124A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets