MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZR102N15A2AAA50124A

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZR102N15A2AAA50124A
York Single Package Air Conditioner ZR102N15A2AAA50124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZR102N15A2AAA50124A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZR102N15A2AAA50124A

York Single Package Air Conditioner ZR102N15A2AAA50124A

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZR102N15A2AAA50124A

Integrate maintenance plans directly into your work orders in MaintainX.

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Cleaning

Check mark

Clean all piping of dirt and scale by hammering on the outside of the pipe.

Check mark

Blow out loose particles from the piping.

Check mark

Pre-Start-Up Check

Check mark

Have all gas lines external to the unit been purged of air?

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Inspection

Check mark

Verify factory phasing of Predator® units

Check mark

Is the blower rotating in the correct direction?

Check mark

Is the compressor rotating in the correct direction?

Check mark

Misphasing Correction

Check mark

Is the electrical connection to the unit misphased?

Check mark

Change the phasing of the Field Line Connection at the factory or field supplied disconnect to obtain proper rotation

Check mark

Scroll Compressor Check

Check mark

Is the scroll compressor drawing low amperage?

Run this procedureArrow right

Joints Leaks Check

Check mark

WARNING!

Check mark

Preparation

Check mark

Ensure all necessary safety equipment is worn

Check mark

Verify that a special pipe dope is used for assembling pipes

Check mark

Gas Connection

Check mark

Open the main shut-off valve to admit normal gas pressure to the mains

Check mark

Leak Detection

Check mark

Use a commercially available soap solution to check all joints for leaks

Check mark

Were any leaks detected?

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A

Check mark

Adjust by turning (B)

Check mark

Ensure nuts (C) are not loosened

Check mark

Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span

Check mark

Enter the deflection distance obtained

Check mark

Enter the deflection force applied

Check mark

Was the belt tension checked at least two times during the first 24 hours of operation?

Check mark

Did any retensioning fall between the min. and max. deflection force values?

Run this procedureArrow right

Initial 10 Hours Set Screws Check

Check mark

Blower System Adjustment

Check mark

Adjust blower speed to specific static and CFM requirements

Check mark

Adjust belt tension as required

Check mark

Set Screws Tightening

Check mark

Tighten blower pulley set screws

Check mark

Tighten motor sheave set screws

Check mark

Post Adjustment Check

Check mark

Re-check set screws after 10-12 hours of run time

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZR102N15A2AAA50124A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets