Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZR102N15A2AAA50124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Gas Piping Cleaning
WARNING!
Pipe Cleaning
Clean all piping of dirt and scale by hammering on the outside of the pipe.
Blow out loose particles from the piping.
Pre-Start-Up Check
Have all gas lines external to the unit been purged of air?
Blower Rotation Check
Initial Inspection
Verify factory phasing of Predator® units
Is the blower rotating in the correct direction?
Is the compressor rotating in the correct direction?
Misphasing Correction
Is the electrical connection to the unit misphased?
Change the phasing of the Field Line Connection at the factory or field supplied disconnect to obtain proper rotation
Scroll Compressor Check
Is the scroll compressor drawing low amperage?
Joints Leaks Check
WARNING!
Preparation
Ensure all necessary safety equipment is worn
Verify that a special pipe dope is used for assembling pipes
Gas Connection
Open the main shut-off valve to admit normal gas pressure to the mains
Leak Detection
Use a commercially available soap solution to check all joints for leaks
Were any leaks detected?
Initial 24 Hours Belt Tension Check
Belt Tension Adjustment
Loosen six nuts (top and bottom) A
Adjust by turning (B)
Ensure nuts (C) are not loosened
Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span
Enter the deflection distance obtained
Enter the deflection force applied
Was the belt tension checked at least two times during the first 24 hours of operation?
Did any retensioning fall between the min. and max. deflection force values?
Initial 10 Hours Set Screws Check
Blower System Adjustment
Adjust blower speed to specific static and CFM requirements
Adjust belt tension as required
Set Screws Tightening
Tighten blower pulley set screws
Tighten motor sheave set screws
Post Adjustment Check
Re-check set screws after 10-12 hours of run time
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX