Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZR120N15A2AAA50124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 10 Hours Set Screws Check
Blower System Adjustment
Adjust blower speed to specific static and CFM requirements
Adjust belt tension as required
Set Screws Tightening
Tighten blower pulley set screws
Tighten motor sheave set screws
Post Adjustment Check
Have the set screws been re-checked after 10-12 hours of run time?
Initial Equipment Inspection
Visual Inspection
Inspect the unit for visible damage during transit
Note the extent of any damage on the carrier’s freight bill
Carrier Inspection Request
Request inspection by the carrier’s agent in writing
Gas Supply Safety Measures
Is the furnace disconnected from the gas supply piping system?
Enter the pressure of the gas supply piping system
Is the pressure of the gas supply piping system equal to or less than 1/2 PSIG?
Filter Cleaning
Filter Inspection and Cleaning
Check that all filters are in place
Are the filters clean?
Clean the filters if dirty
Replace filters if cleaning is not possible
Filter Installation
Install filters ahead of evaporator coil
Ensure filters are of the same size and type as required
Post Installation Check
Supply Air Drive Maintenance
Caution
Review installation for errors, leaks, or undesirable system effects
Is the blower speed change necessary?
Calculate new datum diameter (DD)
Blower Speed Adjustment
Adjust the blower speed according to the new DD
Measure the new CFM
Post-Adjustment Verification
Record the static pressure
Gas Piping Cleaning
WARNING!
Pipe Assembly
Use special pipe dope for assembly
Pipe Cleaning
Clean piping of dirt and scale by hammering on the outside of the pipe
Blow out loose particles from the pipe
Initial Start-up Preparation
Ensure all gas lines external to the unit have been purged of air
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
LP Gas Accessory Kit
1NP0442
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700324
Optional CO2 Sensor Kit
2AQ04700424
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













