MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZR120N15A2AAA50124A

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZR120N15A2AAA50124A
York Single Package Air Conditioner ZR120N15A2AAA50124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZR120N15A2AAA50124A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZR120N15A2AAA50124A

York Single Package Air Conditioner ZR120N15A2AAA50124A

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZR120N15A2AAA50124A

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 10 Hours Set Screws Check

Check mark

Blower System Adjustment

Check mark

Adjust blower speed to specific static and CFM requirements

Check mark

Adjust belt tension as required

Check mark

Set Screws Tightening

Check mark

Tighten blower pulley set screws

Check mark

Tighten motor sheave set screws

Check mark

Post Adjustment Check

Check mark

Have the set screws been re-checked after 10-12 hours of run time?

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Visual Inspection

Check mark

Inspect the unit for visible damage during transit

Check mark

Note the extent of any damage on the carrier’s freight bill

Check mark

Carrier Inspection Request

Check mark

Request inspection by the carrier’s agent in writing

Check mark

Gas Supply Safety Measures

Check mark

Is the furnace disconnected from the gas supply piping system?

Check mark

Enter the pressure of the gas supply piping system

Check mark

Is the pressure of the gas supply piping system equal to or less than 1/2 PSIG?

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection and Cleaning

Check mark

Check that all filters are in place

Check mark

Are the filters clean?

Check mark

Clean the filters if dirty

Check mark

Replace filters if cleaning is not possible

Check mark

Filter Installation

Check mark

Install filters ahead of evaporator coil

Check mark

Ensure filters are of the same size and type as required

Check mark

Post Installation Check

Run this procedureArrow right

Supply Air Drive Maintenance

Check mark

Caution

Check mark

Review installation for errors, leaks, or undesirable system effects

Check mark

Is the blower speed change necessary?

Check mark

Calculate new datum diameter (DD)

Check mark

Blower Speed Adjustment

Check mark

Adjust the blower speed according to the new DD

Check mark

Measure the new CFM

Check mark

Post-Adjustment Verification

Check mark

Record the static pressure

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Assembly

Check mark

Use special pipe dope for assembly

Check mark

Pipe Cleaning

Check mark

Clean piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the pipe

Check mark

Initial Start-up Preparation

Check mark

Ensure all gas lines external to the unit have been purged of air

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZR120N15A2AAA50124A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

LP Gas Accessory Kit

1NP0442

Ducted Systems Accessory Kit

1GP0405

Optional CO2 Space Sensor Kit

2AQ04700324

Optional CO2 Sensor Kit

2AQ04700424

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets