MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZXG14E2A3AA1A111A2

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZXG14E2A3AA1A111A2
York Single Package Air Conditioner ZXG14E2A3AA1A111A2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZXG14E2A3AA1A111A2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZXG14E2A3AA1A111A2

York Single Package Air Conditioner ZXG14E2A3AA1A111A2

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZXG14E2A3AA1A111A2

Integrate maintenance plans directly into your work orders in MaintainX.

Burner Replacement

Check mark

Preliminary Safety Measures

Check mark

Close main manual shut-off valve

Check mark

Shut off all power to the unit

Check mark

Disassembly

Check mark

Open the union fitting upstream of the unit gas valve and downstream from the main manual shut-off valve

Check mark

Remove screws holding each end of the manifold to the manifold supports

Check mark

Disconnect wiring to the gas valve

Check mark

Remove the manifold & gas valve assembly

Check mark

Inspect orifices for wear or damage

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Visual Inspection

Check mark

Inspect the unit for visible damage during transit

Check mark

Note the extent of any damage on the carrier’s freight bill

Check mark

Request inspection by the carrier’s agent in writing

Check mark

Gas Supply System Precautions

Check mark

Is the furnace disconnected from the gas supply piping system?

Check mark

Enter the pressure of the gas supply piping system

Check mark

Is the pressure of the gas supply piping system equal to or less than 1/2 PSIG?

Check mark

Ensure the furnace is isolated from the gas supply piping system by closing its individual manual shut-off valve

Run this procedureArrow right

Belt Tension Maintenance

Check mark

Adjusting Belt Tension

Check mark

Loosen the three nuts (A and B on side and C on back) of motor mount slide plate.

Check mark

Adjust tension by placing a flat head screwdriver into the belt tightening slots and applying pressure against the motor mounting plate.

Check mark

Tighten the three loosened nuts (A, B and C).

Check mark

Checking Belt Deflection

Check mark

Enter the deflection distance obtained (in mm).

Check mark

Is the deflection distance 4mm (5/32")?

Check mark

Final Adjustments

Check mark

Re-tighten nuts (A, B and C) after adjustments are completed.

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Preparation

Check mark

Use a special pipe dope for assembling wrought iron or steel pipe

Check mark

Select the compound used

Check mark

Cleaning Process

Check mark

Clean all piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the piping

Check mark

Pre-Start-Up Check

Check mark

Have all gas lines external to the unit been purged of air?

Run this procedureArrow right

Supply Air Drive Maintenance

Check mark

Review installation for errors, leaks, or undesirable system effects

Check mark

Verify blower speed changes are necessary

Check mark

Calculate new datum diameter (DD)

Check mark

Adjust the variable pitch motor sheave to the new DD

Check mark

Check for changes in static pressure and BHP

Check mark

Ensure AMP draw of the blower motor is within safe limits

Check mark

Confirm blower speed changes adhere to fan laws

Check mark

Verify airflow meets required CFM

Check mark

Only qualified personnel should perform blower speed changes

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZXG14E2A3AA1A111A2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Flue Extension Kit

1FE0416

Roof Curb

1RC0458

Roof Curb

1RC0456

Thru the Base Electrical and Thru the Curb Gas

1TB0401

Thru the Base Electrical and Thru the Curb Gas

1TB0402

Flue Extension Kit

1FE0416

Roof Curb

1RC0458

Roof Curb

1RC0456

Thru the Base Electrical and Thru the Curb Gas

1TB0401

Thru the Base Electrical and Thru the Curb Gas

1TB0402

Flue Extension Kit

1FE0416

Roof Curb

1RC0458

Roof Curb

1RC0456

Thru the Base Electrical and Thru the Curb Gas

1TB0401

Thru the Base Electrical and Thru the Curb Gas

1TB0402

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets