Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZT061C00P1A1AAA1A1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Gas Piping Cleaning
WARNING!
Pipe Cleaning
Clean all piping of dirt and scale by hammering on the outside of the pipe.
Blow out loose particles from the piping.
Pre-Start-Up Check
Have all gas lines external to the unit been purged of air?
Burner Replacement
Preparation
Close main manual shut-off valve
Shut off all power to the unit
Disassembly
Open the union fitting upstream of the unit gas valve and downstream from the main manual shut-off valve
Remove screws holding each end of the manifold to the manifold supports
Disconnect wiring to the gas valve
Remove the manifold & gas valve assembly
Inspection and Replacement
Initial 10 Hours Set Screws Check
Blower System Adjustments
Adjust blower speed to specific static and CFM requirements
Adjust belt tension as required
Sheave and Pulley Verification
Verify proper sheave alignment
Tighten blower pulley set screws
Tighten motor sheave set screws
Post-Adjustment Check
Have the set screws been re-checked after 10-12 hours of run time?
Joints Leaks Check
WARNING!
Gas Connection and Pressure Admission
Open the main shut-off valve to admit normal gas pressure to the mains.
Leak Detection
Check all joints for leaks using soap solution or other suitable material
Ensure no open flames are used during the leak test.
WARNING!
1 Yearly Smoke Detectors Cleaning
WARNING!
WARNING!
WARNING!
Pre-Cleaning Inspection
Inspect the smoke detector for any visible damage or obstruction.
Measure the temperature around the smoke detector to ensure it is within operational limits (-4°F to 158°F).
Measure the pressure differential across the smoke detector's sampling and exhaust ports.
Is the pressure differential within the range of 0.01 to 1.11 inches of water?
Cleaning Procedure
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0454
LP Gas Accessory Kit
1NP0455
Ducted Systems Accessory Kit
1GP0405
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













