Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZXG08E2A3AA1A111A2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 10 Hours Belt Tension Check
Belt Drive Blower Adjustments
Adjust blower speed to specific static and CFM requirements
Adjust belt tension to specific static and CFM requirements
Sheave and Pulley Verification
Verify proper sheave alignment
Tighten blower pulley set screws
Tighten motor sheave set screws
Post-Adjustment Checks
Re-check set screws after 10-12 hours of run time
Supply Air Drive Maintenance
Review installation for errors, leaks, or undesirable system effects
Check blower speed changes for substantial changes in static pressure and BHP
Ensure only qualified personnel make blower speed changes
Adhere strictly to fan laws when making blower speed changes
Measure current CFM
Calculate new datum diameter (DD)
Adjust the variable pitch motor sheave to achieve the new DD
Joints Leaks Check
WARNING!
Gas Connection and Pressure Check
Open the main shut-off valve to admit normal gas pressure to the mains.
Leak Detection
Check all joints for leaks using soap solution or other suitable material. Ensure the following joints are checked:
Was a commercially available soap solution used for leak detection?
WARNING!
Initial Equipment Inspection
Visual Inspection
Inspect the unit for visible damage during transit
Note the extent of any damage on the carrier’s freight bill
Request inspection by the carrier’s agent in writing
Installation Compliance
Ensure installation complies with all applicable codes
Gas Supply System Testing
Is the furnace disconnected from the gas supply piping system?
Enter the pressure of the gas supply piping system
Gas Piping Cleaning
WARNING!
Pipe Assembly
Use special pipe dope for assembly
Pipe Cleaning
Clean piping of dirt and scale by hammering on the outside of the pipe
Blow out loose particles from the pipe
Initial Start-up Preparation
Ensure all gas lines external to the unit have been purged of air
Access the parts list for your equipment in MaintainX.
Flue Extension Kit
1FE0416
Roof Curb
1RC0458
Roof Curb
1RC0456
Thru the Base Electrical and Thru the Curb Gas
1TB0401
Thru the Base Electrical and Thru the Curb Gas
1TB0402
Flue Extension Kit
1FE0416
Roof Curb
1RC0458
Roof Curb
1RC0456
Thru the Base Electrical and Thru the Curb Gas
1TB0401
Thru the Base Electrical and Thru the Curb Gas
1TB0402
Flue Extension Kit
1FE0416
Roof Curb
1RC0458
Roof Curb
1RC0456
Thru the Base Electrical and Thru the Curb Gas
1TB0401
Thru the Base Electrical and Thru the Curb Gas
1TB0402
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX