Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Pump Flygt 3102.090
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
FLS Alarm Stator Housing Inspection
Service in case of alarm
Check for liquid in the stator housing
Drain all liquid, if any
Check the mechanical seal unit, the O-rings, and the cable entry, if liquid was found
Initial 1 Year Pump Inspection
6.4 Service the pump
Check the pump condition
Recommend intervals for periodical inspection and overhaul
Was the inspection performed within the first year of operation?
1 Yearly Oil Change
6.3 Change the oil
Verify the oil type
Ensure the chamber is de-pressurized before opening
Empty the oil
Place the pump in a horizontal position and unscrew the oil plug
Does the pump have a hole marked 'oil out'?
Place a container under the pump and turn the pump
Unscrew the other oil plug
Is the hole marked 'oil in'?
1 Yearly Pump Periodical Inspection
6.4 Service the pump
6.4.1 Inspection
Cable Inspection
Connection to power
Electrical cabinets
Impeller
Junction box
Lifting device
Lifting handle
Initial 2 Month Zinc Anode Inspection
Estimate zinc anode replacement intervals
Remove, weigh, and reinstall one or more of the exterior zinc anodes before starting up the pump
After two months, remove and weigh the same zinc anode or anodes again
Enter the lapsed time in days between initial and second weighing
Enter the anode weight loss in grams
Calculate the anode consumption rate (days/gram)
Calculate future replacement intervals based on selected fraction of zinc remaining
Select the recommended interval for the selection fraction
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX