MaintainX Asset Hub logo
EnterprisePricing
Xylem

Xylem Pump 10SV4FA1A10

Need answers fast?
Explore the manual using AI.

Xylem Pump 10SV4FA1A10
Xylem Pump 10SV4FA1A10

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Xylem Pump 10SV4FA1A10

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Xylem Pump 10SV4FA1A10

Xylem Pump 10SV4FA1A10

Create an account to install this asset package.

Maintenance Plans for Xylem Pump Model 10SV4FA1A10

Integrate maintenance plans directly into your work orders in MaintainX.

Freeze Protection Maintenance

Check mark

Operation

Check mark

Ensure pump is inactive before draining

Check mark

Drain the pump through the drain plugs

Check mark

Has suitable antifreeze been added to the water?

Check mark

Describe any damage or injuries caused by the drained liquid

Run this procedureArrow right

Motor Maintenance

Check mark

Motor Replacement

Check mark

Remove the motor following steps 1 through 4 in the MECHANICAL SEAL REPLACEMENT section

Check mark

For motor frames 213TC and larger, remove components

Check mark

Install the motor adapter flange onto the new motor

Check mark

Torque the 4 hex cap screws to the specified values in the ENGINEERING DATA section

Check mark

Complete the reassembly following steps 17 through 22 in the MECHANICAL SEAL REPLACEMENT section

Check mark

Note any additional unit service or maintenance required

Check mark

Contact local dealer or Goulds Water Technology distributor for assistance if needed

Run this procedureArrow right

Pump Startup Check

Check mark

Start-Up — Wiring and Grounding

Check mark

Install, ground, and wire according to local and National Electrical Code requirements.

Check mark

Install an all leg disconnect switch near pump.

Check mark

Disconnect and lockout electrical power before installing or servicing pump.

Check mark

Verify electrical supply matches pump's nameplate specifications.

Check mark

Ensure wire size limits maximum voltage drop to 10% of motor nameplate voltage.

Check mark

Verify ground wire is at least as large as wires to the motor.

Check mark

Ensure wires are color coded for ease of maintenance.

Check mark

Check three phase motors for all leg protection with properly sized magnetic starters and thermal overloads.

Run this procedureArrow right

6 Monthly Motor Bearing Lubrication

Check mark

MOTOR LUBRICATION — Recommended Motor Bearing Lubrication Intervals

Check mark

Check motor operating hours

Check mark

Verify moisture presence

Check mark

Determine if lubricants are operated at elevated temperatures

Check mark

Ensure not to intermix grease bases

Check mark

Purge old grease completely if changing grease base

Check mark

Avoid over greasing to prevent excessive bearing temperatures

Run this procedureArrow right

3 Monthly Motor Bearing Lubrication

Check mark

Motor Lubrication

Check mark

Recommended Motor Bearing Lubrication Intervals

Check mark

Are lubricants operated at elevated temperatures?

Check mark

Is the lubrication frequency increased due to elevated temperatures?

Check mark

Ensure not to intermix grease bases (lithium, sodium, etc.)

Check mark

Completely purge old grease if changing grease base

Check mark

Check for over greasing to prevent excessive bearing temperatures, lubricant and bearing failure

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Xylem

Explore Other Assets