

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Pump 33SV11GB3D10
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Motor Bearing Lubrication
Motor Lubrication
Check lubrication intervals
Ensure not to intermix grease bases (lithium, sodium, etc.)
Completely purge old grease if changing grease base
Avoid over greasing to prevent excessive bearing temperatures and failures
6 Monthly Motor Bearing Lubrication
Motor Lubrication
Recommended Motor Bearing Lubrication Intervals
Are lubricants operated at elevated temperatures?
Ensure not to intermix grease bases (lithium, sodium, etc.)
Completely purge old grease if changing grease base
Avoid over greasing to prevent excessive bearing temperatures and failures
3 Monthly Motor Bearing Lubrication
Motor Lubrication
Check motor operating conditions
Is the motor operating at elevated temperatures?
Increase lubrication frequency if operating at elevated temperatures
Ensure not to intermix grease bases (lithium, sodium, etc.)
Completely purge old grease if changing grease base
Ensure not to over grease to avoid excessive bearing temperatures and failures
Freeze Protection Maintenance
Operation
Drain the pump through the drain plugs if inactive in freezing conditions
Ensure the drained liquid does not cause damage or injuries
Verify if a suitable antifreeze has been added to the water
Pump Startup Check
Start-Up — Wiring and Grounding
Install, ground, and wire according to local and National Electrical Code requirements.
Install an all leg disconnect switch near pump.
Disconnect and lockout electrical power before installing or servicing pump.
Does the electrical supply match the pump's nameplate specifications?
Use only stranded copper wire to motor and ground.
Enter the wire size to ensure it limits the maximum voltage drop to 10% of the motor nameplate voltage.
Ensure the ground wire is at least as large as the wires to the motor.
Check that wires are color coded for ease of maintenance.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













