Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Pump Flygt 3102.070
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
CLS Alarm Oil Housing Inspection
Service in case of alarm
Check for water in the oil housing
Drain the oil and water
Replace with new oil
1 Yearly Pump Periodical Inspection
6.4 Service the pump
6.4.1 Inspection
Cable Inspection
Connection to power
Electrical cabinets
Impeller
Junction box
Lifting device
Lifting handle
Initial 2 Month Zinc Anode Inspection
5.2 Estimate zinc anode replacement intervals
Remove, weigh, and reinstall one or more of the exterior zinc anodes before starting up the pump
After two months, remove and weigh the same zinc anode or anodes again
Enter the lapsed time in days between the initial and second weighing
Enter the anode weight loss in grams
Calculate the anode consumption rate (days/gram)
Calculate future replacement intervals based on the selected fraction of zinc remaining (0.25–0.50)
2 Monthly Pump Inspection
2.4 Storage guidelines
Is the unit stored for more than six months?
Inspect the unit with special attention to the seals and the cable entry before operating after storage.
Rotate the impeller/propeller to prevent the seals from sticking together.
3 Yearly Pump Overhaul
6.4 Service the pump
Check operating conditions
Inspect key components
Replace key components if necessary
6.4.2 Overhaul
Replace O-rings
Replace seals
Replace bearings
Replace mechanical seal units
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX