Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Lingong Heavy Machinery Work Platform AS3246
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Hydraulic System Check
Hydraulic System Pressure Checks
Is the pressure of the hydraulic system normal?
Is the lift system hydraulic pressure normal?
Is the steering system hydraulic pressure normal?
Is the driving system hydraulic pressure normal?
Hydraulic System Integrity Checks
Check for loose or damaged components
Check for damage or leaks
Hydraulic Oil Level Check
Operation Of Tilt Sensor Testing
Pre-Test Setup
Ensure the platform is completely lowered
Drive two wheels on the same side of the machine up on a 1.37×7.9in (3.5×20cm) block
Tilt Sensor Test
Lift the platform to the specified height from the table
Did the platform stop moving and the tilt alarm sound at 120 times per minute?
Drive Function Test
Is the drive function disabled when moving forward?
Is the drive function disabled when moving in reverse?
1 Daily Work Platform Check
Visual Inspection
Check for loose or damaged bolts or abnormal noise
Check if any circlip or washer on fork arms are damaged, worn, or missing
Check if the platform, scissor stack arm, and chassis are deformed or have broken welds
Check if the paint is excessively chipped or peeling off
Check if the decals and safety signs are correct and legible
Operational Check
Check if the emergency lowering system operates properly
Machine performance and limit switches operate properly
Emergency Lowering Function Testing
Platform Elevation
Push up the platform lift switch to elevate the platform approximately 24 in (60cm)
Emergency Lowering Test
Pull out the emergency lowering control button at the right front part of the machine
Did the platform descend without the lowering alarm sounding?
Switch Control
Switch the key switch to the platform controller
1 Daily Electric System Check
Check battery capacity
Check that all buttons/switches on the PCU panel function normally
Ensure the PCU emergency stop switch is secure
Check if all switches operate properly
Check for damaged wiring harnesses
Ensure the PCU wiring harness connector is secure
Check if the PCU wiring harness connector is not damaged
Check if the PCU wiring harness is crimped or damaged
Check if the lowering solenoid valve is secure and not damaged
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX