Lingong Heavy Machinery Work Platform AS1930
Lingong Heavy Machinery Work Platform AS1930

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Lingong Heavy Machinery Work Platform AS1930

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Lingong Heavy Machinery Work Platform AS1930

Lingong Heavy Machinery Work Platform AS1930

Create an account to install this asset package.

Maintenance Plans for Lingong Heavy Machinery Work Platform Model AS1930

Integrate maintenance plans directly into your work orders in MaintainX.

Pothole Guard Testing

Check mark

Platform Elevation and Pothole Guard Deployment

Check mark

Lift the platform to the specified height

Check mark

Did the pothole guards deploy automatically?

Check mark

Pothole Guard Stability Check

Check mark

Press one side of the pothole guard

Check mark

Press the other side of the pothole guard

Check mark

Did the pothole guard remain immobile?

Check mark

Platform Lowering and Pothole Guard Stowage

Check mark

Lower the platform

Run this procedureArrow right

Emergency Lowering Function Testing

Check mark

Elevate the platform

Check mark

Activate emergency lowering control

Check mark

Switch to platform controller

Run this procedureArrow right

Operation Of Tilt Sensor Testing

Check mark

Pre-Test Setup

Check mark

Ensure the platform is completely lowered

Check mark

Drive two wheels on the same side of the machine up on a 1.37×7.9in (3.5×20cm) block

Check mark

Tilt Sensor Test

Check mark

Lift the platform to the specified height from the table

Check mark

Did the platform stop moving and the tilt alarm sound at 120 times per minute?

Check mark

Drive Function Test

Check mark

Is the drive function disabled when moving forward?

Check mark

Is the drive function disabled when moving in reverse?

Run this procedureArrow right

1 Daily Work Platform Check

Check mark

Check for loose or damaged bolts or abnormal noise

Check mark

Check if any circlip or washer on fork arms are damaged, worn, or missing

Check mark

Check if the emergency lowering system operates properly

Check mark

Check if the platform, scissor stack arm, and chassis are deformed or have broken welds

Check mark

Check if the paint is excessively chipped or peeling off

Check mark

Check if the decals and safety signs are correct and legible

Check mark

Check if the manuals are with the machine

Check mark

Check if machine performance and limit switches operate properly

Run this procedureArrow right

Work Platform Inspection

Check mark

Pre-Operation Inspection Responsibilities

Check mark

Operator is responsible for pre-operation inspection and routine maintenance.

Check mark

Perform visual inspection daily before each work shift.

Check mark

Use inspection to confirm if routine maintenance is required.

Check mark

Pre-Operation Inspection Process

Check mark

Ensure the manual is complete, legible, and stored in the manual box on the platform.

Check mark

Ensure all labels are clear, readable, and appropriately placed.

Check mark

Check for hydraulic oil leakage and proper oil level.

Check mark

Check for battery fluid leakage and suitable liquid level. Add distilled water if required.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Lingong Heavy Machinery

Explore Other Assets