MaintainX Asset Hub logo
EnterprisePricing
Hyster-Yale

Hyster-Yale Forklift Truck UT25P

Need answers fast?
Explore the manual using AI.

Hyster-Yale Forklift Truck UT25P
Hyster-Yale Forklift Truck UT25P

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Hyster-Yale Forklift Truck UT25P

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Hyster-Yale Forklift Truck UT25P

Hyster-Yale Forklift Truck UT25P

Create an account to install this asset package.

Maintenance Plans for Hyster-Yale Forklift Truck Model UT25P

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 166 Hours / 1 Month Hydraulic Transmission Oil Change

Check mark

Preparation

Check mark

Park truck on level ground

Check mark

Lower the forks to the ground and tilt the mast back

Check mark

Engage the parking brake

Check mark

Put transmission in neutral position

Check mark

Turn off engine

Check mark

Safety Warning

Check mark

Ensure no contact with hot hydraulic oil and parts

Check mark

Oil Change Procedure

Run this procedureArrow right

Front Wheel Maintenance

Check mark

Preparation

Check mark

Place lift truck on level concrete

Check mark

Start engine and raise carriage about 100mm height

Check mark

Place chocks behind rear wheels to prevent movement of forklift

Check mark

Loosening and Lifting

Check mark

Loosen wheel nuts 1-2 turns each by turning them counter-clockwise

Check mark

Tilt mast fully backward, and place a wooden block under each side of outer mast

Check mark

Tilt mast forward until front tires are raised from surface

Check mark

Support and Replacement

Run this procedureArrow right

Maintenance-Free Battery Check

Check mark

Battery Indicator Check

Check mark

Check the color of the electric eye indicator

Check mark

Battery Condition Examination

Check mark

Is there any rupture in the battery shell?

Check mark

Is there any leakage from the battery?

Check mark

Is there any sign of battery failure?

Check mark

Refer to the battery label for specific prompts

Run this procedureArrow right

166 Hourly / 1 Monthly Engine Oil And Oil Filter Change

Check mark

Preparation

Check mark

Start the engine and warm-up thoroughly, then shut off.

Check mark

Oil Drainage

Check mark

Remove the cap from the oil filling port and the discharge plug from the oil pan to let the oil flow out.

Check mark

Check for milky engine oil indicating coolant infiltration.

Check mark

Check for very thin oil indicating gasoline contamination.

Check mark

Oil Filter Removal and Installation

Check mark

Ensure drain plug tightening torque is between 29 N·m-39 N·m.

Check mark

Detach the oil filter using the appropriate tool.

Run this procedureArrow right

1000 Hourly / 6 Monthly Fuel Filter Replacement

Check mark

Fuel Filter Removal

Check mark

Remove the fuel filter

Check mark

Remove the transducer

Check mark

New Fuel Filter Installation

Check mark

Install the existing transducer on the new filter

Check mark

Apply a little fuel on the filter airproof

Check mark

Install the new filter

Check mark

Turn the new filter until the airproof mat adheres to the surface

Check mark

Screw down the filter 2/3 turns

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Hyster-Yale

Explore Other Assets