MaintainX Asset Hub logo
EnterprisePricing
Flowserve

Flowserve Pump 6-MFC-15

Need answers fast?
Explore the manual using AI.

Flowserve Pump 6-MFC-15
Flowserve Pump 6-MFC-15

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Pump 6-MFC-15

Flowserve Pump 6-MFC-15

Create an account to install this asset package.

Maintenance Plans for Flowserve Pump Model 6-MFC-15

Integrate maintenance plans directly into your work orders in MaintainX.

Gland Packing Inspection

Check mark

5.8.2 Pumps fitted with packed gland

Check mark

Ensure the following initial conditions are met

Check mark

Is there visible leakage from the gland after pressurization?

Check mark

Is the gland overheating?

Check mark

Stop the pump and allow it to cool if overheating occurs

Check mark

Upon restarting, is leakage taking place at the packed gland?

Check mark

Slacken the gland nuts if necessary to achieve leakage when pumping hot liquids

Check mark

Run the pump for 30 minutes with steady leakage

Check mark

Tighten the gland nuts by 10 degrees at a time until leakage is reduced to an acceptable level

Run this procedureArrow right

Coupling Alignment Check

Check mark

4.8 Final shaft alignment check

Check mark

Rotate the shaft several times by hand to ensure there is no binding and all parts are free.

Check mark

Recheck the coupling alignment to ensure no pipe strain exists.

Check mark

If pipe strain exists, describe the corrective actions taken.

Check mark

6.1.2 Periodic inspection (semi-annual)

Check mark

Check the coupling for correct alignment.

Check mark

Inspect for worn driving elements.

Check mark

4.5.4 Alignment criteria for MFC pumps

Check mark

Verify maximum Total Indicator Reading (TIR) for Woods type coupling

Run this procedureArrow right

1 Yearly Pump Bearing Lubrication Oil Change

Check mark

Periodic inspection (semi-annual)

Check mark

Ensure maximum time between cleaning and lubrication change is one year

Check mark

Determine if environmental severity dictates shorter frequency

Check mark

Complete cleaning during a major overhaul

Check mark

Dismantle the pump

Check mark

Use a brush and wash out the housing with hot oil or non-toxic solvent

Check mark

Flush the housing with light mineral oil to prevent rust

Check mark

Remove solid particles with a brush dipped in hot oil while spinning the bearing

Check mark

Immerse bearings in hot non-toxic solvent if oxidized grease is present

Run this procedureArrow right

Pump Startup Check

Check mark

5.1 Pre-commissioning procedure

Check mark

Ensure the following pre-commissioning checks are completed

Check mark

Pump bearings filled with recommended lubricant

Check mark

All vent connections checked for complete filling of the pump

Check mark

Direction of rotation of the pump checked (Coupling spacer dismantled)

Check mark

Pump rotor and shaft seal in correct axial position

Check mark

Readiness of all auxiliary systems (seal sys., lubrication sys.) for start up

Check mark

All pipe work connected correctly and absolutely tight

Check mark

Is the suction valve open and the discharge valve closed or partially open as required?

Run this procedureArrow right

Wearing Ring Inspection

Check mark

Maintenance of wearing rings

Check mark

Has the pump performance decreased appreciably due to excessive wearing ring clearance?

Check mark

Enter the original nominal design running clearance (in mm)

Check mark

Is rotor removal and resetting of the seal required after adjusting the wearing ring gap?

Check mark

Refer to mechanical seal manufacturer's User Instructions and note any specific requirements

Check mark

Measuring wearing ring gap

Check mark

Select the method used for checking wearing ring clearance

Check mark

Ensure bearing frame support bolts are re-tightened after adjustment

Check mark

Disconnect pump-coupling halves if required

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets