Flowserve Vertical Immersion Sump Pump 2E6x4SP-10

Need answers fast?
Explore the manual using AI.

Flowserve Vertical Immersion Sump Pump 2E6x4SP-10
Flowserve Vertical Immersion Sump Pump 2E6x4SP-10

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Vertical Immersion Sump Pump 2E6x4SP-10

Flowserve Vertical Immersion Sump Pump 2E6x4SP-10

Create an account to install this asset package.

Maintenance Plans for Flowserve Vertical Immersion Sump Pump Model 2E6x4SP-10

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Thrust Ball Bearing Lubrication

Check mark

5.2.2 Thrust Bearing

Check mark

Select the bearing group for lubrication

Check mark

Ensure the bearing temperature is under 71°C (160°F) before proceeding

Check mark

Lubricate the external duplex angular contact thrust bearing [3031] through the grease fitting [3853.2]

Check mark

Select the recommended grease used for lubrication

Check mark

Ensure not to overfill the motor or pump thrust bearings with grease

Check mark

Record the bearing temperature after lubrication

Run this procedureArrow right

Impeller Balancing Inspection

Check mark

Impeller Balancing Overview

Check mark

Verify impeller balance requirement

Check mark

Check if impeller was trimmed by customer

Check mark

Determine maximum acceptable unbalance

Check mark

Identify impeller type for balance method

Check mark

Confirm balancing to ISO 1940 Grade 6.3 tolerance

Check mark

Record any deviations from balance criteria

Check mark

Post-inspection verification

Check mark

Ensure all tools are accounted for

Run this procedureArrow right

4 Hourly Line Shaft Bearing Lubrication

Check mark

5.2.1.3 Grease Lubrication

Check mark

Verify the following conditions before lubrication

Check mark

Select the grease to be used

Check mark

Enter the amount of grease for Intermediate Bearings [3020.1] in grams

Check mark

Enter the amount of grease for Bottom Bearing [3020.2] in grams

Check mark

Is the lubrication process complete for all bearings?

Check mark

Safety Precautions

Check mark

Ensure proper lubrication to prevent bearing failures, pump seizures, and pump failure.

Run this procedureArrow right

External Flush Line Shaft Bearing Lubrication

Check mark

External Flush Lubrication

Check mark

Ensure clean liquid from an external source is used for lubrication

Check mark

Verify continuous liquid supply during operation

Check mark

Check connections to lubrication fittings on pump manifold [3869] and mounting plate [6130]

Check mark

Measure flushing fluid flow rate per bearing

Check mark

Measure flushing fluid flow rate for Group 3

Check mark

Verify flushing fluid pressure is between 1.4 kg/cm² to 5.6 kg/cm² (20 PSIG to 80 PSIG) above sump pressure

Check mark

Ensure rubber bearings are wet at all times during operation

Run this procedureArrow right

8 Hourly Line Shaft Bearing Lubrication

Check mark

5.2.1.3 Grease Lubrication

Check mark

Verify all components are in place

Check mark

Ensure grease is water-resistant and insoluble in the liquid being pumped

Check mark

Select the grease used

Check mark

Enter the amount of grease for Intermediate Bearings [3020.1]

Check mark

Enter the amount of grease for Bottom Bearing [3020.2]

Check mark

Re-grease each bearing prior to start-up through the grease fittings

Check mark

Safety Precautions

Check mark

Ensure proper lubrication to prevent bearing failures, pump seizures, and pump failure

Run this procedureArrow right

Parts for Flowserve Vertical Immersion Sump Pump 2E6x4SP-10

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets