MaintainX Asset Hub logo
EnterprisePricing
Flowserve

Flowserve Vertical Immersion Sump Pump 2E3x2SP-10

Need answers fast?
Explore the manual using AI.

Flowserve Vertical Immersion Sump Pump 2E3x2SP-10
Flowserve Vertical Immersion Sump Pump 2E3x2SP-10

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Vertical Immersion Sump Pump 2E3x2SP-10

Flowserve Vertical Immersion Sump Pump 2E3x2SP-10

Create an account to install this asset package.

Maintenance Plans for Flowserve Vertical Immersion Sump Pump Model 2E3x2SP-10

Integrate maintenance plans directly into your work orders in MaintainX.

Impeller Balancing Inspection

Check mark

Impeller Balancing Overview

Check mark

Verify impeller balance requirement

Check mark

Check if impeller was trimmed by customer

Check mark

Determine maximum acceptable unbalance

Check mark

Identify impeller type for balance method

Check mark

Perform balance to ISO 1940 Grade 6.3 tolerance criteria

Check mark

Record the balancing results

Check mark

Post-inspection verification

Check mark

Ensure all tools are accounted for

Run this procedureArrow right

Packing Gland Adjustment

Check mark

SECTION: 6.9.5 Seal and packing installation (if equipped)

Check mark

Applies to pumps equipped with shaft packing.

Check mark

Ensure the gland nuts [6580.8] are evenly finger tight and then tighten an additional ¼ turn.

Check mark

Final tightness is set via leakage.

Check mark

A slight amount of leakage through the gland [4120.1] is necessary for proper lubrication.

Check mark

Packing glands must never be tightened to the point where leakage from the packing is stopped.

Check mark

SECTION: 6.1 Maintenance schedule

Check mark

Gland packing must be adjusted correctly to give visible leakage and concentric alignment of the gland follower to prevent excessive temperature of the packing or follower.;

Run this procedureArrow right

Thrust Bearing Replacement

Check mark

6.7.2 Pump Disassembly — Thrust Bearing Removal

Check mark

Remove snap ring [2530.2]

Check mark

Use an arbor or hydraulic press to remove the bearings from the adjusting sleeve

Check mark

Apply even pressure to the inner bearing race only

Check mark

Note any damage observed during removal

Check mark

6.9.4 Ball Bearing/Adjusting Sleeve Assembly

Check mark

Ensure clean environment for bearing mounting

Check mark

Wear clean gloves

Check mark

Remove bearings from protective packaging immediately before assembly

Run this procedureArrow right

Mechanical Seal Inspection

Check mark

SECTION: 6.1 Maintenance schedule

Check mark

Check for any leaks from gaskets and seals.

Check mark

The correct functioning of the shaft seal must be checked regularly.

Check mark

CAUTION — Seals must never be run without lubrication. Abrasive lubrication will greatly reduce seal life:;

Run this procedureArrow right

1 Monthly Thrust Ball Bearing Lubrication

Check mark

Thrust Bearing Lubrication Conditions

Check mark

Check if bearing temperature is between 80–94°C (175–200°F)

Check mark

Verify lubrication interval is 1.5 months

Check mark

Lubrication Process

Check mark

Select the lubrication group

Check mark

Apply recommended grease

Check mark

Lubricate through the grease fitting [3853.2]

Check mark

Post-Lubrication Check

Check mark

Ensure motor or pump thrust bearings are not overfilled with grease

Run this procedureArrow right

Parts for Flowserve Vertical Immersion Sump Pump 2E3x2SP-10

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets