MaintainX Asset Hub logo
EnterprisePricing
Flowserve

Flowserve Vertical Immersion Sump Pump 2E4x3SP-82

Need answers fast?
Explore the manual using AI.

Flowserve Vertical Immersion Sump Pump 2E4x3SP-82
Flowserve Vertical Immersion Sump Pump 2E4x3SP-82

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Vertical Immersion Sump Pump 2E4x3SP-82

Flowserve Vertical Immersion Sump Pump 2E4x3SP-82

Create an account to install this asset package.

Maintenance Plans for Flowserve Vertical Immersion Sump Pump Model 2E4x3SP-82

Integrate maintenance plans directly into your work orders in MaintainX.

Impeller Balancing Inspection

Check mark

Impeller Balancing Overview

Check mark

Verify impeller balance requirement

Check mark

Check if impeller was trimmed by customer

Check mark

Determine maximum acceptable unbalance based on RPM

Check mark

Identify impeller type for balance method

Check mark

Confirm balancing to ISO 1940 Grade 6.3 tolerance criteria

Check mark

Record any deviations from standard balancing procedure

Check mark

Post-inspection review

Check mark

Review inspection results with team

Run this procedureArrow right

12 Monthly Pump Storage Maintenance

Check mark

2.4.2 Long term storage and packaging

Check mark

Ensure all packaging components are in place

Check mark

Is the assembly hermetically sealed from the atmosphere?

Check mark

Is the packaging intact and undamaged?

Check mark

Rotate the pump shaft approximately 10 revolutions

Check mark

Record any issues or observations during the inspection

Run this procedureArrow right

Pump Maintenance

Check mark

6.7 Disassembly

Check mark

Warnings

Check mark

6.7.1 Removing pump from pit

Check mark

Close control valve in discharge line

Check mark

Lock out power supply to driver

Check mark

Disconnect all electrical connections

Check mark

Close all valves on auxiliary equipment and piping then disconnect all auxiliary piping

Check mark

Disconnect discharge piping from pump

Check mark

Remove coupling guard and coupling halves

Run this procedureArrow right

Pump Startup Check

Check mark

5.1 Pre-commissioning procedure

Check mark

Check that all pre-commissioning steps are completed

Check mark

Rotate the shaft by hand to ensure all rotating parts move freely and there are no foreign objects in the pump casing

Check mark

5.7 Starting the pump

Check mark

Ensure the pump is primed

Check mark

Start and regulate all flush lines

Check mark

Start the driver (electric motor)

Check mark

Slowly open the discharge valve until the desired flow is reached

Check mark

Check all joints and mechanical seal for leakage

Run this procedureArrow right

Initial Driver Bearing Lubrication

Check mark

Driver Bearings

Check mark

Re-grease driver bearings before starting the pump

Check mark

Consult the manufacturer's directions for lubricating instructions

Check mark

Select the recommended grease for motor

Run this procedureArrow right

Parts for Flowserve Vertical Immersion Sump Pump 2E4x3SP-82

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets