MaintainX Asset Hub logo
EnterprisePricing
WorldWide Electric Corporation

WorldWide Electric Corporation Induction Motor NATJ12-36-56CB

Need answers fast?
Explore the manual using AI.

WorldWide Electric Corporation Induction Motor NATJ12-36-56CB
WorldWide Electric Corporation Induction Motor NATJ12-36-56CB

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for WorldWide Electric Corporation Induction Motor NATJ12-36-56CB

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

WorldWide Electric Corporation Induction Motor NATJ12-36-56CB

WorldWide Electric Corporation Induction Motor NATJ12-36-56CB

Create an account to install this asset package.

Maintenance Plans for WorldWide Electric Corporation Induction Motor Model NATJ12-36-56CB

Integrate maintenance plans directly into your work orders in MaintainX.

30 Daily Storage Winding Insulation Resistance Testing

Check mark

STORAGE

Check mark

Measure and record the resistance of the winding insulation every 30 days of storage.

Check mark

TESTING

Check mark

Check the insulation resistance of the stator windings with a megohmmeter if the motor has been in storage for a long period or exposed to adverse conditions.

Check mark

Determine if it is necessary to change out bearings based on storage length and conditions.

Check mark

Is the resistance lower than 1 megohm?

Check mark

If resistance is lower than 1 megohm, dry the windings using one of the following methods:

Check mark

Constantly monitor the conditions during the drying process.

Run this procedureArrow right

500 Hourly Motor Inspection

Check mark

Maintenance

Check mark

Ensure ventilation openings are clear and unobstructed

Check mark

Check the condition of shaft seals and replace if necessary

Check mark

Check the condition of connections and mounting and assembly bolts

Check mark

Bearing Condition Check

Check mark

Listen for any unusual noise from the bearings

Check mark

Record vibration measurement

Check mark

Record bearing temperature

Check mark

Inspect spent grease for abnormalities

Run this procedureArrow right

Initial Motor Mounting Inspection

Check mark

Mounting

Check mark

Ensure the underside of the motor feet and/or flange is clean and free of dirt.

Check mark

Is the motor level?

Check mark

Remove any masking materials or rust inhibitive coating from the mounting surface and shaft.

Check mark

Verify ball bearing motor mounting positions as per NEMA MG1-4.03

Check mark

Is the motor used with an elastic coupling system?

Check mark

Is the motor securely installed to a rigid foundation or mounting surface?

Check mark

Remove drain plugs from the end shield or frame on totally enclosed motors.

Check mark

Are the drain plugs mounted at the lowest point of the frame?

Run this procedureArrow right

Initial Motor Startup Check

Check mark

Start Up

Check mark

Disconnect the load when starting the motor, ensuring the key is removed from the shaft.

Check mark

Check direction of rotation. Is the rotation correct?

Check mark

If rotation must be changed, describe the steps taken to interchange power leads.

Check mark

Is the motor starting quickly and running smoothly when coupled to the load?

Check mark

If the motor does not start quickly and run smoothly, describe the identified cause.

Check mark

Enter the motor current after a few minutes of operation.

Check mark

Is the motor current within the acceptable range based on the nameplate rating and service factor?

Check mark

For AC motors with frequency inverters, is the maximum speed rating not exceeded?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from WorldWide Electric Corporation

Explore Other Assets