MaintainX, an Autodesk company
EnterprisePricing
Flowserve

Flowserve Pump Mark 3 1K 3x2-6

Need answers fast?
Explore the manual using AI.

Flowserve Pump Mark 3 1K 3x2-6
Flowserve Pump Mark 3 1K 3x2-6

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Flowserve Pump Mark 3 1K 3x2-6

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Pump Mark 3 1K 3x2-6

Flowserve Pump Mark 3 1K 3x2-6

Create an account to install this asset package.

Maintenance Plans for Flowserve Pump Model Mark 3 1K 3x2-6

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Storage Maintenance

Check mark

Storage

Check mark

Store the pump in a clean, dry location away from vibration.

Check mark

Leave flange covers in place to keep dirt and other foreign material out of pump casing.

Check mark

Turn the pump shaft at regular intervals to prevent brinelling of the bearings and the seal faces from sticking.

Check mark

Rotate the pump shaft approximately 10 revolutions every three months.

Check mark

Consult Flowserve for preservative actions if storage period exceeds 6 months.

Check mark

Short Term Storage and Packaging

Check mark

Ensure normal packaging is used for shipment and dry, indoor storage for up to six months.

Check mark

Package all loose unmounted items in a waterproof plastic bag and place under the coupling guard.

Run this procedureArrow right

Impeller Clearance Calibration

Check mark

Impeller Clearance

Check mark

Enter the current process temperature

Check mark

Select the impeller type

Check mark

Enter the current impeller clearance measurement (mm)

Check mark

Is the current impeller clearance within the specified range for the given temperature?

Check mark

Adjust the impeller clearance if necessary

Check mark

Describe any adjustments made to the impeller clearance

Run this procedureArrow right

6 Weekly Pump Grease Lubrication

Check mark

Pump Lubricants — Grease

Check mark

Verify lubrication intervals based on temperature

Check mark

Ensure bearing temperature is between 80-94°C (175-200°F)

Check mark

Remove pipe plug from inboard and outboard bearing locations

Check mark

Regrease the bearings

Check mark

Has the bearing been relubricated three times?

Check mark

Clean out the bearing housing if relubricated three times

Check mark

Safety Precautions

Check mark

Stop the pump

Run this procedureArrow right

3 Monthly Pump Oil Change

Check mark

Pump Lubricants — Oil Bath (Mineral Oil)

Check mark

Verify lubrication interval based on temperature

Check mark

Confirm bearing temperature is 71-80°C (160-175°F)

Check mark

Fill the bearing housing to the center of the oil sight glass with the proper type oil

Check mark

Ensure no detergent oils are used

Run this procedureArrow right

Initial Pump Start-Up Check

Check mark

Pre-Commissioning Procedure — Pre Start-Up Checks

Check mark

Ensure all components are properly secured and installed

Check mark

Perform rotation check

Check mark

Verify installation and operation of components

Check mark

Is the pump primed?

Check mark

Rotate the shaft by hand

Run this procedureArrow right

Parts for Flowserve Pump Mark 3 1K 3x2-6

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Casing

1100

Cover

1220

Adapter - Bearing Housing

1340

Shaft

2100

Impeller

2200

Casing

1100

Cover

1220

Adapter - Bearing Housing

1340

Shaft

2100

Impeller

2200

Casing

1100

Cover

1220

Adapter - Bearing Housing

1340

Shaft

2100

Impeller

2200

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets