Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Flowserve Pump Mark 3 3K 8x6-14A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Storage Maintenance
Storage
Store the pump in a clean, dry location away from vibration.
Leave flange covers in place to keep dirt and other foreign material out of pump casing.
Turn the pump shaft at regular intervals to prevent brinelling of the bearings and the seal faces from sticking.
Rotate the pump shaft approximately 10 revolutions every three months.
Consult Flowserve for preservative actions if storage period exceeds 6 months.
Short Term Storage and Packaging
Ensure normal packaging is used for shipment and dry, indoor storage for up to six months.
Package all loose unmounted items in a waterproof plastic bag and place under the coupling guard.
18 Monthly Pump Oil Change
Pump Lubricants — Oil Bath (Synthetic Oil)
Verify lubricant type
Check if Viton O-rings are required for the synthetic lubricant
Fill the bearing housing to the center of the oil sight glass with the proper type oil
Initial 160 Hours Pump Oil Change
Pump Lubricants — Oil Bath
Record the external bearing housing temperature
Is the external bearing housing temperature within the maximum limit?
Change the oil after 160 hours of operation
Examine and describe any contaminants found in the used oil
Initial Pump Start-Up Check
Pre-Commissioning Procedure — Pre Start-Up Checks
Ensure all components are properly secured and installed
Perform rotation check
Check impeller clearance setting
Verify shaft seal is properly installed
Ensure seal support system is operational
Check bearing lubrication
Verify bearing housing cooling system is operational
Ensure support leg cooling for centerline mounting option is operational
Sealed Bearing Maintenance
Pump Lubricants — Grease for Life
Verify that double shielded or double sealed bearings are packed with grease by the manufacturer
Confirm that bearings are not relubricated
Assess the operating temperature and speed of the bearings
Determine if the replacement interval is affected by operating conditions
Check if shielded bearings are operating cooler than expected
Access the parts list for your equipment in MaintainX.
Casing
1100
Cover
1220
Adapter - Bearing Housing
1340
Shaft
2100
Impeller
2200
Casing
1100
Cover
1220
Adapter - Bearing Housing
1340
Shaft
2100
Impeller
2200
Casing
1100
Cover
1220
Adapter - Bearing Housing
1340
Shaft
2100
Impeller
2200
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX