Frick Compressor Unit RWB II-177

Need answers fast?
Explore the manual using AI.

Frick Compressor Unit RWB II-177
Frick Compressor Unit RWB II-177

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Frick Compressor Unit RWB II-177

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Frick Compressor Unit RWB II-177

Frick Compressor Unit RWB II-177

Create an account to install this asset package.

Maintenance Plans for Frick Compressor Unit Model RWB II-177

Integrate maintenance plans directly into your work orders in MaintainX.

30000 Hourly Coalescer Maintenance

Check mark

Maintenance Schedule

Check mark

Replace Coalescers at specified hours of operation

Check mark

Change oil when changing coalescer filter element(s)

Check mark

Change cartridge(s) in oil filters

Check mark

Remove and clean applicable strainer elements

Check mark

Ensure only Frick filter elements are used to avoid warranty issues

Run this procedureArrow right

5000 Hourly Suction and Discharge Flange Bolt Check

Check mark

Maintenance Schedule

Check mark

Check Suction & Discharge Flange Bolts at specified hours

Check mark

Bolt Tightness Verification

Check mark

Verify tightness of bolts on suction flange

Check mark

Verify tightness of bolts on discharge flange

Check mark

Torque Specifications by Model

Check mark

Select RWB II model for torque specification

Check mark

Enter torque for discharge flange (ft-lb)

Check mark

Enter torque for suction flange (ft-lb)

Run this procedureArrow right

Initial Compressor Unit Start-Up Check

Check mark

Initial Start-Up Procedure

Check mark

Is the start-up supervised by a Johnson Controls-Frick authorized representative?

Check mark

Ensure prestart check is accomplished as per the FORMS section

Check mark

Is there an adequate refrigerant load available for load testing?

Check mark

Compressor Operation

Check mark

Enter the compressor speed

Check mark

Enter the discharge pressure

Check mark

Is the compressor running at the proper speed and discharge pressure?

Check mark

Motor Bearings

Run this procedureArrow right

Initial 1000 Hours Oil Test

Check mark

Maintenance Schedule

Check mark

Check oil analysis at 1000 hours of operation

Check mark

Participate in a regular, periodic oil analysis program

Check mark

Are Frick filter elements used?

Run this procedureArrow right

Initial 200 Hours Compressor Unit Vibration Check

Check mark

Maintenance Schedule / Vibration Analysis

Check mark

Ensure vibration readings are taken from the correct locations and load percentage

Check mark

Record the vibration reading at Location A

Check mark

Record the vibration reading at Location B

Check mark

Record the vibration reading at Location C

Check mark

Are the vibration readings within the acceptable range?

Check mark

Describe any anomalies or unusual findings in the vibration readings

Check mark

Is there any influence from nearby equipment or connected piping?

Check mark

Provide recommendations if vibration levels are above normal

Run this procedureArrow right

Parts for Frick Compressor Unit RWB II-177

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Frick

Explore Other Assets