MaintainX, an Autodesk company
EnterprisePricing
Frick

Frick Compressor Unit RXF-85

Need answers fast?
Explore the manual using AI.

Frick Compressor Unit RXF-85
Frick Compressor Unit RXF-85

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Frick Compressor Unit RXF-85

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Frick Compressor Unit RXF-85

Frick Compressor Unit RXF-85

Create an account to install this asset package.

Maintenance Plans for Frick Compressor Unit Model RXF-85

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Coupling Check

Check mark

Maintenance Schedule

Check mark

Check Coupling

Check mark

Check bolts, shim packs, center inserts, keys, and all bolt torques

Run this procedureArrow right

Initial Compressor Unit Start-Up Check

Check mark

Initial Start-Up Procedure

Check mark

Is the refrigerant load adequate for load testing?

Check mark

Record the start-up time

Check mark

Enter the load percentage during start-up

Check mark

Adjust liquid injection oil cooling, if applicable

Check mark

Adjust water control valve to cooler, if applicable

Check mark

Calibrate the compressor slide valve

Check mark

Record the time after 24 hours of operation

Check mark

Pull and clean suction strainer after 24 hours operation

Run this procedureArrow right

Compressor Unit Storage Maintenance

Check mark

Holding Charge and Storage

Check mark

Ensure the nitrogen charge is safely released before entering the unit

Check mark

Remove holding charge shipping gauges before pressure testing and refrigerant charging

Check mark

Is the unit stored in a clean, dry location?

Check mark

Is proper care given to the solid state components of the microprocessor?

Check mark

Has the nitrogen charge been checked for units stored over two months?

Check mark

Contact Johnson Controls-Frick for long term storage procedure if needed

Run this procedureArrow right

Initial 24 Hours Suction Strainer Cleaning

Check mark

Initial Start-Up Procedure

Check mark

Pull and clean suction strainer after 24 hours operation.

Check mark

Is the suction strainer excessively dirty?

Check mark

Repeat cleaning every 24 hours until system is clean if strainer is excessively dirty.

Check mark

Follow the Maintenance Schedule if strainer is not excessively dirty.

Run this procedureArrow right

6 Monthly Compressor Unit Oil Test

Check mark

Maintenance Schedule

Check mark

Oil Analysis: Every 6 Months

Check mark

Participate in a regular, periodic oil analysis program to maintain oil and system integrity

Run this procedureArrow right

Parts for Frick Compressor Unit RXF-85

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Frick

Explore Other Assets