MaintainX, an Autodesk company
EnterprisePricing
Frick

Frick Compressor Unit RXF-50

Need answers fast?
Explore the manual using AI.

Frick Compressor Unit RXF-50
Frick Compressor Unit RXF-50

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Frick Compressor Unit RXF-50

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Frick Compressor Unit RXF-50

Frick Compressor Unit RXF-50

Create an account to install this asset package.

Maintenance Plans for Frick Compressor Unit Model RXF-50

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Coupling Check

Check mark

Maintenance Schedule

Check mark

Check Coupling

Check mark

Check bolts, shim packs, center inserts, keys, and all bolt torques

Run this procedureArrow right

Compressor Unit Storage Maintenance

Check mark

Holding Charge and Storage

Check mark

Ensure the nitrogen charge is safely released before entering the unit

Check mark

Remove holding charge shipping gauges before pressure testing and refrigerant charging

Check mark

Store units in a clean, dry location to prevent corrosion damage

Check mark

Consider proper care for solid state components of the microprocessor

Check mark

Check nitrogen charge for units stored over two months

Check mark

Contact Johnson Controls-Frick for long term storage procedure if needed

Run this procedureArrow right

Oil Cooler Chemical Cleaning

Check mark

Water-Cooled Oil Cooling

Check mark

Verify water conditions

Check mark

Is there accelerated scaling on the heat exchanger?

Check mark

Prepare a 3% solution of Phosphoric or Oxalic Acid

Check mark

Is the cleaning solution suitable for stainless steel?

Check mark

Back flush the oil cooler with the cleaning solution for 30 minutes

Check mark

Rinse the heat exchanger with fresh water to remove cleaning solution

Check mark

Record any observations or issues during the cleaning process

Run this procedureArrow right

5000 Hourly Compressor Unit Maintenance

Check mark

VFD Units Check

Check mark

Check VFD Units Skip Frequency

Check mark

Check for excess vibration and skip frequencies when operating conditions change

Check mark

Electrical Connections Check

Check mark

Check Electrical Connections

Check mark

Torque all terminals in the processor and starter panel as per specification

Check mark

Sensor Calibration Check

Check mark

Check Sensor Calibration

Check mark

Check calibration of

Run this procedureArrow right

Initial 200 Hours Coupling Check

Check mark

Maintenance Schedule

Check mark

Check that all the parts are in place

Check mark

Enter the torque value for each bolt

Run this procedureArrow right

Parts for Frick Compressor Unit RXF-50

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Frick

Explore Other Assets