

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Frick Compressor Unit RWB II-60
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
30000 Hourly Coalescer Maintenance
Maintenance Schedule
Replace Coalescers at specified hours of operation
Change the oil when changing the coalescer filter element(s)
Change cartridges in oil filters
Remove and clean applicable strainer elements
Ensure only Frick filter elements are used to avoid warranty issues
Refer to the Coalescer Filter Element(s) procedure in the manual for detailed replacement steps
Oil Cooler Chemical Cleaning
Water-Cooled Oil Cooling
Prepare a 3% solution of Phosphoric or Oxalic Acid
Ensure the cleaning solution is suitable for stainless steel
Back flush the oil cooler with the cleaning solution for 30 minutes
Rinse the heat exchanger with fresh water
Compressor Unit Storage Maintenance
Holding Charge and Storage
Ensure the nitrogen charge is safely released before entering the unit
Remove holding charge shipping gauges before pressure testing and refrigerant charging
Store units in a clean, dry location to prevent corrosion damage
Consider proper care for solid-state components of the microprocessor
Has the nitrogen charge been checked for units stored over two months?
Cooling Water Quality Check
Water-Cooled Oil Cooling
Ensure all parts are in place for the closed-loop system
Measure the pH level of the cooling water
Is the pH level between 6.0 and 7.4?
Describe any issues with the cooling water or closed-loop fluids
Initial Compressor Unit Start-Up Check
Initial Start-Up Procedure
Is the start-up supervised by a Johnson Controls-Frick authorized representative?
Ensure prestart check is accomplished as per the FORMS section
Is there an adequate refrigerant load available for testing?
Compressor Operation Check
Enter the compressor speed
Enter the discharge pressure
Is the compressor running at the proper speed and discharge pressure?
Motor Bearings Preparation
Access the parts list for your equipment in MaintainX.
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













