

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Frick Compressor Unit RXF-39
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Compressor Unit Storage Maintenance
Holding Charge and Storage
Ensure the nitrogen charge is safely released before entering the unit
Remove holding charge shipping gauges before pressure testing and charging with refrigerant
Store units in a clean, dry location to prevent corrosion damage
Consider proper care for solid state components of the microprocessor
Check nitrogen charge for units stored over two months
Contact Johnson Controls-Frick for long term storage procedure if needed
10000 Hourly Compressor Unit Maintenance
Filter Replacement
Replace Filters
Use Frick filter elements only
Oil Strainer Maintenance
Clean Oil Strainers
Refer to Oil Pump Strainer procedure for cleaning steps
Liquid Strainer Maintenance
Clean Liquid Strainers
Refer to Liquid Injection Strainer procedure for cleaning steps
Initial 200 Hours Coupling Check
Maintenance Schedule
Check that all the parts are in place
Enter the torque value for each bolt
Is the torque within the specified range for all bolts?
6 Monthly Compressor Unit Oil Test
Maintenance Schedule
Perform oil analysis every 6 months
Conduct initial oil check at 1000 hours of operation
Participate in a regular, periodic oil analysis program to maintain oil and system integrity
Initial 24 Hours Suction Strainer Cleaning
Initial Start-Up Procedure
Pull and clean suction strainer after 24 hours operation.
Is the suction strainer excessively dirty?
Next Steps
Access the parts list for your equipment in MaintainX.
Oil Analysis Kit
333Q0001853
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Oil Analysis Kit
333Q0001853
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Oil Analysis Kit
333Q0001853
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













