Manual for Frick Compressor Unit RXF-30

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Frick Compressor Unit RXF-30

Frick Compressor Unit RXF-30

Create an account to install this asset package.

Maintenance Plans for Frick Compressor Unit Model RXF-30

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 1000 Hours Oil Test

Check mark

Maintenance Schedule

Check mark

Check oil analysis at 1000 hours of operation

Check mark

Schedule oil analysis every 6 months thereafter

Check mark

Use Frick oil filter elements only

Check mark

Participate in a regular oil analysis program

Check mark

Record Oil Analysis Kit part number

Check mark

Take oil samples after the oil filter

Run this procedureArrow right

Initial 200 Hours Vibration Check

Check mark

Maintenance Schedule / Vibration Analysis

Check mark

Vibration Reading Locations

Check mark

Enter the vibration reading at Location A

Check mark

Enter the vibration reading at Location B

Check mark

Enter the vibration reading at Location C

Check mark

Is the vibration level within the acceptable range at all locations?

Check mark

Evaluate the vibration readings carefully

Check mark

Was the vibration analysis influenced by other equipment?

Check mark

Record any additional observations or comments

Run this procedureArrow right

Initial Compressor Unit Start-Up Check

Check mark

Initial Start-Up Procedure

Check mark

Ensure adequate refrigerant load is available for load testing

Check mark

Operate the unit at as high a load as possible for 3 hours

Check mark

Adjust liquid injection oil cooling if applicable

Check mark

Adjust water control valve to cooler if applicable

Check mark

Calibrate the compressor slide valve

Check mark

Pull and clean suction strainer after 24 hours of operation

Check mark

Check if suction strainer is excessively dirty

Check mark

Repeat suction strainer cleaning every 24 hours if dirty

Run this procedureArrow right

Oil Cooler Chemical Cleaning

Check mark

Water-Cooled Oil Cooling

Check mark

Verify water conditions

Check mark

Prepare a 3% solution of Phosphoric or Oxalic Acid

Check mark

Specify alternative cleaning solution used, if any

Check mark

Back flush the oil cooler with the cleaning solution

Check mark

Rinse the heat exchanger with fresh water

Run this procedureArrow right

Initial 24 Hours Suction Strainer Cleaning

Check mark

Initial Start-Up Procedure

Check mark

Pull and clean suction strainer after 24 hours operation.

Check mark

Is the suction strainer excessively dirty?

Check mark

Repeat cleaning every 24 hours until system is clean if strainer is excessively dirty.

Check mark

Follow the Maintenance Schedule if strainer is not excessively dirty.

Run this procedureArrow right

Parts for Frick Compressor Unit RXF-30

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Oil Analysis Kit

333Q0001853

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Frick

Explore Other Assets