

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Frick Compressor Unit RWB II-100
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Compressor Unit Vibration Check
Maintenance Schedule / Vibration Analysis
Measure vibration levels on all bearings
Record the vibration levels
Are the vibration levels within the acceptable range?
If vibration levels are high, schedule immediate maintenance
Initial Compressor Unit Start-Up Check
Initial Start-Up Procedure
Is the start-up supervised by a Johnson Controls-Frick authorized representative?
Ensure prestart check is accomplished as per the FORMS section
Is there an adequate refrigerant load available for load testing?
Compressor Operation
Enter the compressor speed
Enter the discharge pressure
Is the compressor running at the proper speed and discharge pressure?
Motor Bearings
30000 Hourly Coalescer Maintenance
Maintenance Schedule
Replace Coalescers at specified hours of operation
Change the oil when changing the coalescer filter element(s)
Change cartridges in oil filters
Remove and clean applicable strainer elements
Ensure only Frick filter elements are used to avoid warranty issues
Compressor Unit Oil Change
Maintenance Schedule
Change oil as directed by oil analysis
Shut down the unit when changing oil
Change and clean components
Ensure no mixing of oils from different brands, manufacturers, or types
Refer to the Changing Oil procedure in the manual for detailed steps
10000 Hourly Compressor Unit Maintenance
Filter Maintenance
Replace Filters
Use Frick filter elements only
Refer to Oil Filter (OF-1) Main Single/Dual procedure for replacement steps
Oil Strainer Maintenance
Clean Oil Strainers
Refer to Strainer - Demand Oil Pump procedure for cleaning steps
Liquid Strainer Maintenance
Clean Liquid Strainers
Access the parts list for your equipment in MaintainX.
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













