MaintainX, an Autodesk company
EnterprisePricing
Frick

Frick Compressor Unit RWB II-270

Need answers fast?
Explore the manual using AI.

Frick Compressor Unit RWB II-270
Frick Compressor Unit RWB II-270

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Frick Compressor Unit RWB II-270

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Frick Compressor Unit RWB II-270

Frick Compressor Unit RWB II-270

Create an account to install this asset package.

Maintenance Plans for Frick Compressor Unit Model RWB II-270

Integrate maintenance plans directly into your work orders in MaintainX.

Compressor Unit Storage Maintenance

Check mark

Holding Charge and Storage

Check mark

Ensure the nitrogen charge is safely released before entering the unit

Check mark

Remove holding charge shipping gauges before pressure testing and refrigerant charging

Check mark

Store units in a clean, dry location to prevent corrosion damage

Check mark

Consider proper care for the solid-state components of the microprocessor

Check mark

Has the nitrogen charge been checked for units stored over two months?

Run this procedureArrow right

Initial 200 Hours Compressor Unit Vibration Check

Check mark

Maintenance Schedule / Vibration Analysis

Check mark

Check vibration analysis at 200 hours of operation

Check mark

Schedule vibration analysis every 6 months thereafter

Check mark

Have vibration levels increased since the last check?

Check mark

Take vibration readings from the following locations

Check mark

Record vibration reading at current load percentage

Check mark

Record baseline vibration reading from start-up

Check mark

Evaluate and describe any discrepancies in vibration readings

Check mark

Is there any influence from other equipment operating nearby?

Run this procedureArrow right

6 Monthly Oil Test

Check mark

Maintenance Schedule

Check mark

Oil Analysis

Check mark

Participate in a regular, periodic oil analysis program to maintain oil and system integrity

Run this procedureArrow right

10000 Hourly Compressor Unit Maintenance

Check mark

Filter Maintenance

Check mark

Replace Filters

Check mark

Use only Frick filter elements to avoid warranty issues

Check mark

Oil Strainer Maintenance

Check mark

Clean Oil Strainers

Check mark

Liquid Strainer Maintenance

Check mark

Clean Liquid Strainers

Check mark

Suction Strainer Maintenance

Check mark

Check and Clean Suction Strainer

Run this procedureArrow right

Cooling Water Quality Check

Check mark

Water-Cooled Oil Cooling

Check mark

Ensure the following conditions are met for the waterside of the oil cooler

Check mark

Measure the pH level of the cooling water

Check mark

Is the pH level between 6.0 and 7.4?

Check mark

Describe any issues found with the cooling water or closed-loop fluids

Run this procedureArrow right

Parts for Frick Compressor Unit RWB II-270

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Frick

Explore Other Assets