Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Frick Compressor Unit RWB II-222
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Oil Cooler Chemical Cleaning
Water-Cooled Oil Cooling
Ensure all necessary equipment and materials are available
Prepare a 3% solution of the chosen acid
Back flush the oil cooler with the solution for 30 minutes
Rinse the heat exchanger with fresh water
Was the cleaning process successful?
Notes on the cleaning process
Initial 1000 Hours Oil Test
Maintenance Schedule
Check oil analysis at 1000 hours of operation
Participate in a regular, periodic oil analysis program
Use only Frick filter elements to avoid warranty issues
10000 Hourly Compressor Unit Maintenance
Filter Maintenance
Replace Filters at 10,000 hours of operation
Refer to the Oil Filter (OF-1) Main Single/Dual procedure for replacement steps
Ensure only Frick filter elements are used
Oil Strainer Maintenance
Clean Oil Strainers at 10,000 hours of operation
Refer to the Strainer - Demand Oil Pump procedure for cleaning steps
Liquid Strainer Maintenance
Clean Liquid Strainers at 10,000 hours of operation
6 Monthly Compressor Unit Vibration Check
Maintenance Schedule / Vibration Analysis
Measure vibration levels on all bearings
Record any abnormal vibration levels
Is continuous vibration monitoring in place?
If vibration levels are abnormal, schedule more frequent checks
Initial Compressor Unit Start-Up Check
Initial Start-Up Procedure
Is the start-up supervised by a Johnson Controls-Frick authorized representative?
Ensure prestart check is accomplished as per the FORMS section
Is there an adequate refrigerant load available for load testing?
Enter the compressor speed
Enter the discharge pressure
Are the motor bearings rotated and lubricated according to manufacturer’s recommendations?
Enter the differential pressure between suction and discharge
Was the differential pressure of 55 PSI achieved within five minutes of start-up?
Access the parts list for your equipment in MaintainX.
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX