

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Frick Compressor Unit RWB II-399
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cooling Water Quality Check
Water-Cooled Oil Cooling
Verify the system type
Is the water treatment adequate?
Measure the pH level of the cooling water
Is the pH level between 6.0 and 7.4?
Describe any issues with the cooling water or closed-loop fluids
Oil Cooler Chemical Cleaning
Water-Cooled Oil Cooling
Select the cleaning solution to be used
Enter the duration for back flushing in minutes
Was the heat exchanger rinsed with fresh water after back flushing?
Initial 200 Hours Compressor Unit Vibration Check
Maintenance Schedule / Vibration Analysis
Ensure vibration readings are taken from the correct locations and load percentage
Record the vibration reading at Location A
Record the vibration reading at Location B
Record the vibration reading at Location C
Are the vibration readings within the acceptable range?
Describe any anomalies or unusual findings in the vibration readings
Was the vibration analysis compared to the baseline reference?
Note any external factors that might have influenced the vibration readings
500 Hourly / 60 Daily Demand Pump Grease Lubrication
Demand Pump — Preventative Maintenance
Grease all zerks
Is the service severe?
Use a hand gun for greasing
Select the type of grease used
Related Demand Pump Maintenance
Is packing adjustment required?
Was packing replaced or a different type used?
Is end clearance adjustment required?
5000 Hourly Suction and Discharge Flange Bolt Check
Maintenance Schedule
Check Suction & Discharge Flange Bolts at specified hours
Bolt Tightness Verification
Verify tightness of bolts on suction flange
Verify tightness of bolts on discharge flange
Torque Specifications by Model
Select RWB II model for torque specification
Enter torque for discharge flange (ft-lb)
Enter torque for suction flange (ft-lb)
Access the parts list for your equipment in MaintainX.
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
Cable, Belden, For RS-422 Communications
9829
Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length
9841
Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port
639C0133G01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













