MaintainX, an Autodesk company
EnterprisePricing
Frick

Frick Compressor Unit RWB II-399

Need answers fast?
Explore the manual using AI.

Frick Compressor Unit RWB II-399
Frick Compressor Unit RWB II-399

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Frick Compressor Unit RWB II-399

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Frick Compressor Unit RWB II-399

Frick Compressor Unit RWB II-399

Create an account to install this asset package.

Maintenance Plans for Frick Compressor Unit Model RWB II-399

Integrate maintenance plans directly into your work orders in MaintainX.

Cooling Water Quality Check

Check mark

Water-Cooled Oil Cooling

Check mark

Verify the system type

Check mark

Is the water treatment adequate?

Check mark

Measure the pH level of the cooling water

Check mark

Is the pH level between 6.0 and 7.4?

Check mark

Describe any issues with the cooling water or closed-loop fluids

Run this procedureArrow right

Oil Cooler Chemical Cleaning

Check mark

Water-Cooled Oil Cooling

Check mark

Select the cleaning solution to be used

Check mark

Enter the duration for back flushing in minutes

Check mark

Was the heat exchanger rinsed with fresh water after back flushing?

Run this procedureArrow right

Initial 200 Hours Compressor Unit Vibration Check

Check mark

Maintenance Schedule / Vibration Analysis

Check mark

Ensure vibration readings are taken from the correct locations and load percentage

Check mark

Record the vibration reading at Location A

Check mark

Record the vibration reading at Location B

Check mark

Record the vibration reading at Location C

Check mark

Are the vibration readings within the acceptable range?

Check mark

Describe any anomalies or unusual findings in the vibration readings

Check mark

Was the vibration analysis compared to the baseline reference?

Check mark

Note any external factors that might have influenced the vibration readings

Run this procedureArrow right

500 Hourly / 60 Daily Demand Pump Grease Lubrication

Check mark

Demand Pump — Preventative Maintenance

Check mark

Grease all zerks

Check mark

Is the service severe?

Check mark

Use a hand gun for greasing

Check mark

Select the type of grease used

Check mark

Related Demand Pump Maintenance

Check mark

Is packing adjustment required?

Check mark

Was packing replaced or a different type used?

Check mark

Is end clearance adjustment required?

Run this procedureArrow right

5000 Hourly Suction and Discharge Flange Bolt Check

Check mark

Maintenance Schedule

Check mark

Check Suction & Discharge Flange Bolts at specified hours

Check mark

Bolt Tightness Verification

Check mark

Verify tightness of bolts on suction flange

Check mark

Verify tightness of bolts on discharge flange

Check mark

Torque Specifications by Model

Check mark

Select RWB II model for torque specification

Check mark

Enter torque for discharge flange (ft-lb)

Check mark

Enter torque for suction flange (ft-lb)

Run this procedureArrow right

Parts for Frick Compressor Unit RWB II-399

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Cable, Belden, For RS-422 Communications

9829

Cable, Belden, For RS-485 Up To 2000 Feet (600 Meters) Total Cable Length

9841

Optical Isolation Kit, Frick, One Kit Is Required Per Comm Port

639C0133G01

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Frick

Explore Other Assets