Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Flowserve Vertical Immersion Sump Pump 2E3x1.5SP-82
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
4 Hourly Line Shaft Bearing Lubrication
5.2.1.3 Grease Lubrication
Verify the following conditions before lubrication
Select the grease to be used
Enter the amount of grease for Intermediate Bearings [3020.1] in grams
Enter the amount of grease for Bottom Bearing [3020.2] in grams
Ensure proper lubrication to prevent bearing failures, pump seizures, and pump failure
Suction Strainer Cleaning
Discharge piping
Reattach strainer to suction flange of the casing if it was removed for cleaning or replacement
Ensure strainer does not need removal unless for cleaning or replacement
Faults, Causes and Remedies
Check for plugged impeller, strainer, or casing due to product or large solids
Clean strainer if plugged
Packing Replacement
Seal and Packing Installation
Verify packing sizes for each group
Confirm packing arrangement is 2-C-3 for all groups
Install one ring of packing at a time, ensuring it is pushed well into place
Install two rings of packing, then the seal cage, followed by additional rings until the box is filled
Ensure joints of succeeding rings are staggered
Align the taped hole in the stuffing box with the seal cage when packing is compressed
Draw up the nuts on the gland evenly finger tight after the last ring is in place
Save additional packing rings for future use
Impeller Balancing Inspection
Impeller Balancing Inspection
Verify impeller balance requirements
Enter maximum acceptable unbalance for up to 1800 rpm (g·mm/kg)
Enter maximum acceptable unbalance for above 1800 rpm (g·mm/kg)
Is the impeller balanced to ISO 1940 Grade 6.3 tolerance criteria?
Impeller Clearance Inspection
5.3 Impeller clearance
Check impeller type
Measure impeller clearance
Is the impeller clearance within nominal range?
Adjust impeller clearance if necessary
Ensure seal is not set during adjustment
Access the parts list for your equipment in MaintainX.
Casing
1100
Cover
1220
Clamp - Lube Piping
1232.1
Cover Plate - Clamp
1232.2
Flange - Companion
1245.1
Casing
1100
Cover
1220
Clamp - Lube Piping
1232.1
Cover Plate - Clamp
1232.2
Flange - Companion
1245.1
Casing
1100
Cover
1220
Clamp - Lube Piping
1232.1
Cover Plate - Clamp
1232.2
Flange - Companion
1245.1
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX