MaintainX Asset Hub logo
EnterprisePricing
Flowserve

Flowserve Vertical Immersion Sump Pump 2E2x1LFSP-10

Need answers fast?
Explore the manual using AI.

Flowserve Vertical Immersion Sump Pump 2E2x1LFSP-10
Flowserve Vertical Immersion Sump Pump 2E2x1LFSP-10

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Vertical Immersion Sump Pump 2E2x1LFSP-10

Flowserve Vertical Immersion Sump Pump 2E2x1LFSP-10

Create an account to install this asset package.

Maintenance Plans for Flowserve Vertical Immersion Sump Pump Model 2E2x1LFSP-10

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Component Cleaning

Check mark

6.8.1 Cleaning/inspection

Check mark

Ensure all parts are thoroughly cleaned and inspected

Check mark

Use new components

Check mark

Replace any worn or corroded parts with new genuine Flowserve parts

Check mark

Use only non-flammable, non-contaminated cleaning fluids that comply with plant safety and environmental guidelines

Run this procedureArrow right

4 Hourly Line Shaft Bearing Lubrication

Check mark

5.2.1.3 Grease Lubrication

Check mark

Verify the following conditions before lubrication

Check mark

Select the grease to be used

Check mark

Enter the amount of grease for Intermediate Bearings [3020.1] in grams

Check mark

Enter the amount of grease for Bottom Bearing [3020.2] in grams

Check mark

Is the lubrication completed successfully?

Check mark

Safety Precautions

Check mark

Ensure proper lubrication to prevent bearing failures, pump seizures, and pump failure.

Run this procedureArrow right

Impeller Balancing Inspection

Check mark

Impeller Balancing

Check mark

Verify impeller balance requirements

Check mark

Enter the impeller speed (rpm)

Check mark

Enter the measured unbalance (g·mm/kg)

Check mark

Is the unbalance within acceptable limits for the given speed?

Check mark

Was the impeller balanced to ISO 1940 Grade 6.3 tolerance criteria?

Run this procedureArrow right

Thrust Bearing Replacement

Check mark

6.7.2 Pump Disassembly — Thrust Bearing Removal

Check mark

Remove snap ring [2530.2]

Check mark

Use an arbor or hydraulic press to remove the bearings from the adjusting sleeve

Check mark

Apply even pressure to the inner bearing race only

Check mark

Note any damage observed during removal

Check mark

6.9.4 Ball Bearing/Adjusting Sleeve Assembly

Check mark

Ensure clean environment for bearing mounting

Check mark

Wear clean gloves

Check mark

Remove bearings from protective packaging immediately before assembly

Run this procedureArrow right

Initial Thrust Ball Bearing Lubrication

Check mark

Thrust Bearing Preparation

Check mark

Verify initial lubrication amounts before first start

Check mark

Select recommended grease

Check mark

Bearing Lubrication

Check mark

Are the new bearings already lubricated?

Check mark

Pack new bearings with grease if not lubricated

Check mark

Lubricate the housing as described

Check mark

Safety Precautions

Check mark

Ensure not to overfill the motor or pump thrust bearings with grease

Run this procedureArrow right

Parts for Flowserve Vertical Immersion Sump Pump 2E2x1LFSP-10

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets