MaintainX Asset Hub logo
EnterprisePricing
Flowserve

Flowserve Vertical Immersion Sump Pump 2E3x1.5SP-10

Need answers fast?
Explore the manual using AI.

Flowserve Vertical Immersion Sump Pump 2E3x1.5SP-10
Flowserve Vertical Immersion Sump Pump 2E3x1.5SP-10

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Vertical Immersion Sump Pump 2E3x1.5SP-10

Flowserve Vertical Immersion Sump Pump 2E3x1.5SP-10

Create an account to install this asset package.

Maintenance Plans for Flowserve Vertical Immersion Sump Pump Model 2E3x1.5SP-10

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Thrust Ball Bearing Lubrication

Check mark

5.2.2 Thrust Bearing

Check mark

Verify bearing temperature is within range

Check mark

Select lubrication group based on re-lubrication amounts

Check mark

Lubricate the external duplex angular contact thrust bearing through the grease fitting [3853.2]

Check mark

Use recommended grease

Check mark

Ensure not to overfill the motor or pump thrust bearings with grease

Run this procedureArrow right

4 Hourly Line Shaft Bearing Lubrication

Check mark

5.2.1.3 Grease Lubrication

Check mark

Verify the following conditions before lubrication

Check mark

Select the grease to be used

Check mark

Enter the amount of grease for Intermediate Bearings [3020.1] in grams

Check mark

Enter the amount of grease for Bottom Bearing [3020.2] in grams

Check mark

Ensure proper lubrication to prevent bearing failures, pump seizures, and pump failure

Run this procedureArrow right

6 Monthly Thrust Ball Bearing Lubrication

Check mark

Thrust Bearing Lubrication Conditions

Check mark

Verify bearing temperature is under 71°C (160°F)

Check mark

Ensure lubrication interval is 6 months

Check mark

Lubrication Process

Check mark

Select the lubrication group

Check mark

Apply recommended grease

Check mark

Lubricate through the grease fitting [3853.2]

Check mark

Safety Precautions

Check mark

Ensure not to overfill the motor or pump thrust bearings with grease

Run this procedureArrow right

Pump Component Cleaning

Check mark

6.8.1 Cleaning/inspection

Check mark

Ensure all parts are thoroughly cleaned and inspected

Check mark

Use new bearings, O-rings, gaskets, and lip seals

Check mark

Replace any parts showing wear or corrosion with new genuine Flowserve parts

Check mark

Verify that only non-flammable, non-contaminated cleaning fluids are used

Run this procedureArrow right

Packing Gland Adjustment

Check mark

Seal and packing installation

Check mark

Ensure the gland nuts [6580.8] are evenly finger tight.

Check mark

Tighten the gland nuts an additional ¼ turn.

Check mark

Is there a slight amount of leakage through the gland [4120.1]?

Check mark

Ensure packing glands are not tightened to the point where leakage is stopped.

Check mark

Maintenance schedule

Check mark

Is the gland packing adjusted to give visible leakage?

Check mark

Is the gland follower in concentric alignment?

Check mark

Ensure there is no excessive temperature of the packing or follower.

Run this procedureArrow right

Parts for Flowserve Vertical Immersion Sump Pump 2E3x1.5SP-10

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Casing

1100

Cover

1220

Clamp - Lube Piping

1232.1

Cover Plate - Clamp

1232.2

Flange - Companion

1245.1

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets